// CODE SNIPPET
3102F.3.3.2 Subsequent Audits
JUMP TO FULL CODE CHAPTER
A subsequent audit of each terminal shall be completed concurrently with the inspections (see Section 3102F.3.5). The audit team leader shall recommend either: (1) a default subsequent audit interval of 4 years, or (2) an alternate interval, based on assessments of the structural, mechanical and electrical systems, and consideration of:
- The extent of the latest deterioration and/or disrepair,
- The rate of future anticipated deterioration and/or disrepair,
- The underwater inspection guidance provided in Table 31F-2-1, and
- Other specified factors.
Based on independent assessment of these factors, the Division may accept the audit team leader's recommendation or require a different subsequent audit interval.
If there are no changes in the defined purpose (see Section 3102F.3.6.1) of the berthing system(s), relevant prior analyses may be referenced. However, if there is a significant change in the operations or condition of berthing system(s), a new analysis may be required.
The Division may require an audit, inspection or supplemental evaluations to justify changes in the use of the berthing system(s).
Related Code Sections
3102F.3.3.2 [SLC] Marine Oil Terminals, Subsequent Audits
A subsequent audit of
each terminal shall be completed concurrently with the
inspections (see Section 3102F.3.5). The audit team
leader shall ...
California Building Code 2019 (Vol 1 & 2) > 31F [SLC] Marine Oil Terminals > 3102F Audit and Inspection > 3102F.3 Audits > 3102F.3.3 Schedule > 3102F.3.3.2 Subsequent Audits
3102F.3.3.2 [SLC] Marine Oil Terminals, Subsequent Audits
A subsequent audit of each terminal shall be completed concurrently with the inspections (see Section 3102F.3.5). The audit team leader shall ...
California Building Code 2016 (Vol 1 & 2) > 31F [SLC] Marine Oil Terminals > 3102F Audit and Inspection > 3102F.3 Audits > 3102F.3.3 Schedule > 3102F.3.3.2 Subsequent Audits
3102F.3.3.2 [SLC] Marine Oil Terminals, Subsequent Audits
A subsequent audit of each terminal shall be completed concurrently with the inspections (see Section 3102F.3.5). The audit team leader shall ...
California Building Code 2022 (Vol 1 & 2) > 31F [SLC] Marine Oil Terminals > 3102F Audit and Inspection > 3102F.3 Audits > 3102F.3.3 Schedule > 3102F.3.3.2 Subsequent Audits
3102F.3.3 [SLC] Marine Oil Terminals, Schedule
A subsequent audit of
each terminal shall ...
California Building Code 2019 (Vol 1 & 2) > 31F [SLC] Marine Oil Terminals > 3102F Audit and Inspection > 3102F.3 Audits > 3102F.3.3 Schedule
3102F.3.7 [SLC] Marine Oil Terminals, Follow-Up Actions
in subsequent ES-2 tables, and removed entirely in the subsequent audit.
The "Deficiency Item Labels" shall be assigned in the format shown above ...
California Building Code 2019 (Vol 1 & 2) > 31F [SLC] Marine Oil Terminals > 3102F Audit and Inspection > 3102F.3 Audits > 3102F.3.7 Follow-Up Actions