• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

3102F.3.3.2 Subsequent Audits

California Building Code 2016 (Vol 1 & 2) > 31F [SLC] Marine Oil Terminals > 3102F Audit and Inspection > 3102F.3 Audits > 3102F.3.3 Schedule > 3102F.3.3.2 Subsequent Audits
JUMP TO FULL CODE CHAPTER
A subsequent audit of each terminal shall be completed concurrently with the inspections (see Section 3102F.3.5). The audit team leader shall recommend either: (1) a default subsequent audit interval of 4 years, or (2) an alternate interval, based on assessments of the structural, mechanical and electrical systems, and consideration of:
  1. The extent of the latest deterioration and/or disrepair,
  2. The rate of future anticipated deterioration and/or disrepair,
  3. The underwater inspection guidance provided in Table 31F-2-1, and
  4. Other specified factors.
Based on independent assessment of these factors, the Division may accept the audit team leader's recommendation or require a different subsequent audit interval.
If there are no changes in the defined purpose (see Section 3102F.3.6.1) of the berthing system(s), relevant prior analyses may be referenced. However, if there is a significant change in the operations or condition of berthing system(s), a new analysis may be required.
The Division may require an audit, inspection or supplemental evaluations to justify changes in the use of the berthing system(s).

Related Code Sections


3102F.3.3.2 [SLC] Marine Oil Terminals, Subsequent Audits
A subsequent audit of each terminal shall be completed concurrently with the inspections (see Section 3102F.3.5). The audit team leader shall ...
California Building Code 2019 (Vol 1 & 2) > 31F [SLC] Marine Oil Terminals > 3102F Audit and Inspection > 3102F.3 Audits > 3102F.3.3 Schedule > 3102F.3.3.2 Subsequent Audits
3102F.3.3.2 [SLC] Marine Oil Terminals, Subsequent Audits
A subsequent audit of each terminal shall be completed concurrently with the inspections (see Section 3102F.3.5). The audit team leader shall ...
California Building Code 2016 (Vol 1 & 2) > 31F [SLC] Marine Oil Terminals > 3102F Audit and Inspection > 3102F.3 Audits > 3102F.3.3 Schedule > 3102F.3.3.2 Subsequent Audits
3102F.3.3.2 [SLC] Marine Oil Terminals, Subsequent Audits
A subsequent audit of each terminal shall be completed concurrently with the inspections (see Section 3102F.3.5). The audit team leader shall ...
California Building Code 2022 (Vol 1 & 2) > 31F [SLC] Marine Oil Terminals > 3102F Audit and Inspection > 3102F.3 Audits > 3102F.3.3 Schedule > 3102F.3.3.2 Subsequent Audits
3102F.3.3 [SLC] Marine Oil Terminals, Schedule
A subsequent audit of each terminal shall ...
California Building Code 2019 (Vol 1 & 2) > 31F [SLC] Marine Oil Terminals > 3102F Audit and Inspection > 3102F.3 Audits > 3102F.3.3 Schedule
3102F.3.7 [SLC] Marine Oil Terminals, Follow-Up Actions
in subsequent ES-2 tables, and removed entirely in the subsequent audit. The "Deficiency Item Labels" shall be assigned in the format shown above ...
California Building Code 2019 (Vol 1 & 2) > 31F [SLC] Marine Oil Terminals > 3102F Audit and Inspection > 3102F.3 Audits > 3102F.3.7 Follow-Up Actions
Help Contact Us Privacy Terms
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Compare
Code Compare
Highlight differences between any two building codes.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING