• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

3306.5.1.1 Submittal Documents for Full or Partial Demolition Using Mechanical Equipment Other Than Handheld

NYC Building Code 2022 > 33 Safeguards During Construction or Demolition > 3306 Demolition > 3306.5 Submittal Documents for Demolition > 3306.5.1 Required Documents > 3306.5.1.1 Submittal Documents for Full or Partial Demolition Using Mechanical Equipment Other Than Handheld
JUMP TO FULL CODE CHAPTER
Submittal documents for full or partial demolition using mechanical equipment other than handheld shall be signed, sealed and submitted by a registered design professional.

Related Code Sections


3306.5.1.1 Safeguards During Construction or Demolition, Submittal Documents for Full or Partial Demolition Using Mechanical Equipment Other Than Handheld
Submittal documents for full or partial demolition using mechanical equipment other than handheld shall be signed, sealed and submitted ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3306 Demolition > 3306.5 Submittal Documents for Demolition > 3306.5.1 Required Documents > 3306.5.1.1 Submittal Documents for Full or Partial Demolition Using Mechanical Equipment Other Than Handheld
3306.5.1.1 Safeguards During Construction or Demolition, Submittal Documents for Full or Partial Demolition Using Mechanical Equipment Other Than Handheld
Submittal documents for full or partial demolition using mechanical equipment other than handheld shall be signed, sealed and submitted ...
NYC Building Code 2022 > 33 Safeguards During Construction or Demolition > 3306 Demolition > 3306.5 Submittal Documents for Demolition > 3306.5.1 Required Documents > 3306.5.1.1 Submittal Documents for Full or Partial Demolition Using Mechanical Equipment Other Than Handheld
3306.5.1.1 Safeguards During Construction or Demolition, Submittal Documents for Full or Partial Demolition Using Mechanical Equipment Other Than Handheld
Submittal documents for full or partial demolition using mechanical equipment other than handheld shall be signed, sealed and submitted ...
NYC Building Code 2008 > 33 Safeguards During Construction or Demolition > 3306 Demolition > 3306.5 Submittal Documents for Demolition > 3306.5.1 Required Documents > 3306.5.1.1 Submittal Documents for Full or Partial Demolition Using Mechanical Equipment Other Than Handheld
3306.5.2 Safeguards During Construction or Demolition, Maintenance of Submittal Documents
shall be a violation of this code to use mechanical equipment, whether handheld or other than handheld, to perform full or partial demolitions unless ...
NYC Building Code 2022 > 33 Safeguards During Construction or Demolition > 3306 Demolition > 3306.5 Submittal Documents for Demolition > 3306.5.2 Maintenance of Submittal Documents
3306.5.2 Safeguards During Construction or Demolition, Maintenance of Submittal Documents
to use mechanical equipment, whether handheld or other than handheld, to perform full or partial demolitions unless the approved submittal documents ...
NYC Building Code 2008 > 33 Safeguards During Construction or Demolition > 3306 Demolition > 3306.5 Submittal Documents for Demolition > 3306.5.2 Maintenance of Submittal Documents
Help Contact Us Privacy Terms
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Compare
Code Compare
Highlight differences between any two building codes.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING