UpCodes logo
// CODE SNIPPET

315.5 Submission of Welding and Brazing Forms to the Division of Industrial Compliance (DIC)

Jump To Full Code Chapter
Each manufacturer or contractor of metallic building services piping systems referenced by this code who causes welding or brazing to be performed shall file with the superintendent of the division of industrial compliance in the department of commerce, or the superintendent's designee, certified copies of the welding and brazing procedure specifications, the procedure qualification records, and the welder and brazer performance qualifications of the welders and brazers used in the proposed construction of a new or altered piping system. The required documentation shall be submitted in accordance with rules adopted by the superintendent.

Related Code Sections