  1. Application. Applications for approval of plans and specifications shall be submitted to the DSA regional office serving the project location unless specific approval for submittal elsewhere is given by the State Architect. Processing shall be completed by the receiving office but portions of the work may be reassigned.
  2. Construction documents. All documents such as notices in accordance with Sections 4-331 and 4-332, qualification records in accordance with Sections 4-333 and 4-341, test reports in accordance with Section 4-335, special inspection reports in accordance with Section 4-335, verified reports in accordance with Section 4-336, and semimonthly reports in accordance with Section 4-337 shall be submitted to the appropriate DSA regional office according to location of the project.
Authority: Education Code Sections 17310 and 81142.
Reference: Education Code Sections 17295, 17299, 17309, 81133, 81135 and 81141.
  1. (OSA/SS 1/92) Regular order by the Office of the State Architect/Structural Safety Section to amend Section 4-352, Part 1, Title 24, C.C.R. Filed with the Secretary of State on December 15, 1992; effective July 1, 1993. Approved by the California Building Standards Commission on December 9, 1992.
Upcodes Diagrams

Related Code Sections

4-352 Safety of Construction of Public Schools, Submission of Documents
of the work may be reassigned. (b) Construction documents. All documents such as notices (see Sections 4-331 and 4-332), qualification records (see ...
R109.1.3 Scope and Application, Floodplain Inspections
vertical construction, the building official shall require submission of documentation, prepared and sealed by a registered design professional ...
R109.1.3 Scope and Application, Floodplain Inspections
to further vertical construction, the building official shall require submission of documentation, prepared and sealed by a registered design professional ...