// CODE SNIPPET
104.8.1.1 Submission
JUMP TO FULL CODE CHAPTER
Any person seeking a modification shall submit a written request to the commissioner stating the grounds thereof supported by relevant evidence and citation to this code or any other law, rule or regulation or other legal authority. Any additional information or other supplemental submission requested by the commissioner shall be filed with the department within 20 calendar days of the date of the request, or within such other time as may be prescribed by the commissioner.
Related Code Sections
1617.6.3 Structural Design, Phased Submission
with sufficient information on which to make a structural peer review of the phased submission ...
NYC Building Code 2014 > 16 Structural Design > 1617 Structural Peer Review > 1617.6 Structural Peer Review Report > 1617.6.3 Phased Submission
1618.7.3 Structural Design, Phased Submission
with sufficient information on which to make a structural peer review of the phased submission. In addition to the requirements of this
section, phased ...
NYC Building Code 2022 > 16 Structural Design > 1618 Structural Peer Review > 1618.7 Structural Peer Review Report > 1618.7.3 Phased Submission
1627.7.3 Structural Design, Phased Submission
be provided with sufficient information on which to make a structural peer review of the phased submission ...
NYC Building Code 2008 > 16 Structural Design > 1627 Structural Peer Review > 1627.7 Structural Peer Review Report > 1627.7.3 Phased Submission
1818.5.3 Soils and Foundations, Phased Submission
be provided with sufficient information on which to make a geotechnical peer review of the phased submission. In addition to the requirements of this section ...
NYC Building Code 2022 > 18 Soils and Foundations > 1818 Geotechnical Peer Review > 1818.5 Geotechnical Peer Review Report > 1818.5.3 Phased Submission
§28-103.24 Administration, Electronic Submissions
The commissioner shall have the discretion to require that any document or payment submitted to the department be submitted and/or signed ...
NYC General Admin. Provisions 2022 > 1 Administration > 103 Duties and Powers of Commissioner of Buildings > §28-103.24 Electronic Submissions