A layer of gas-permeable material shall be placed under all concrete slabs and other floor systems that directly contact the ground and are within the walls of the living spaces of the building, to facilitate future installation of a subslab depressurization system, if needed. The gas-permeable layer shall consist of one of the following:
  1. A uniform layer of clean aggregate, not less than 4 inches (102 mm) thick. The aggregate shall consist of material that will pass through a 2-inch (51 mm) sieve and be retained by a 1/4-inch (6.4 mm) sieve.
  2. A uniform layer of sand (native or fill), not less than 4 inches (102 mm) thick, overlain by a layer or strips of geotextile drainage matting designed to allow the lateral flow of soil gases.
  3. Other materials, systems or floor designs with demonstrated capability to permit depressurization across the entire subfloor area.

Related Code Sections

AF103.2 Radon Control Methods, Subfloor Preparation
materials, systems or floor designs with demonstrated capability to permit depressurization across the entire subfloor area ...
AF103.2 Radon Control Methods, Subfloor Preparation
materials, systems or floor designs with demonstrated capability to permit depressurization across the entire subfloor area ...
805.1.1 Interior Finishes, Subfloor Construction
Floor sleepers, bucks and nailing blocks shall not be constructed of combustible materials, unless the space between the fire-resistance-rated floor ...