4.106.2 Storm Water Drainage and Retention During Construction
JUMP TO FULL CODE CHAPTER
Projects which disturb less than one acre of soil and are not part of a larger common plan of development which in total disturbs one acre or more, shall manage storm water drainage during construction. In order to manage storm water drainage during construction, one or more of the following measures shall be implemented to prevent flooding of adjacent property, prevent erosion and retain soil runoff on the site.:
- Retention basins of sufficient size shall be utilized to retain storm water on the site.;
- Where storm water is conveyed to a public drainage system, collection point, gutter, or similar disposal method, water shall be filtered by use of a barrier system, wattle or other method approved by the enforcing agency.Department; or
- Compliance with a lawfully enactedCity of Los Angeles' storm water management ordinance(s).
Related Code Sections
R300.1 Building Planning, Storm Water Drainage and Retention During Construction
, shall manage storm water drainage during construction in accordance with the California Green Building Standards Code, Chapter 4, Division 4.1 ...
Los Angeles Residential Code > 3 Building Planning > R300 Site Drainage > R300.1 Storm Water Drainage and Retention During Construction
3304.1.5 Safeguards During Construction, [HCD] Storm Water Drainage and Retention During Construction
, shall manage storm water drainage during contsruction in accordance with the California Green Building Standards Code (CALGreen), Chapter 4, Division ...
Los Angeles Building Code > 33 Safeguards During Construction > 3304 Site Work > 3304.1 Excavation and Fill > 3304.1.5 [HCD] Storm Water Drainage and Retention During Construction
1101.12 Storm Drainage, Roof Drainage
drainage shall be provided by an open-sided
roof or scuppers where the roof perimeter
construction extends above the roof in such a manner
that water ...
Section 4.106 Residential Mandatory Measures, Site Development
and are not part of a larger common plan of development which in total disturbs one acre or more, shall manage storm water drainage during construction. In order ...
1105.0 Storm Drainage, Controlled-Flow Roof Drainage
on the roof exceeding 24 hours.
During the storm, the water depth on the roof shall not
exceed the depths specified in Table 1105.1(1).
Not less ...