4-223 General
The provisions of Article 1 and Article 2 of these regulations shall apply to state-owned or state-leased essential services buildings. Article 2 requirements do not apply to essential services buildings under the jurisdiction of local enforcement agencies.
Authority: Health and Safety Code Section 16022.
Reference: Health and Safety Code Section 16001.
4-224 Application for DSA Approval of Drawings and Specifications
  1. The written approval of drawings and specifications shall consist of a letter issued by DSA when the procedures of Section 4-229 of these regulations are completed.
  2. The agency responsible for the essential services function shall submit an application, for the approval of drawings and specifications to DSA. A separate application shall be submitted for each essential services building or group of buildings on each site. Applications shall be submitted to DSA on Form DSA-1, Application for Approval of Plans and Specifications. DSA forms are available on the Internet at www.dgs.ca.gov/dsa, or at any of the DSA regional offices.
  3. The application shall contain a project name and location of the essential services building or buildings, the name of the architect or registered engineer in general responsible charge of the work, the names of the architects or registered engineers who have been delegated responsibility for portions of the work (see Section 4-209), the estimated cost of the project and all such other information as is requested on Form DSA-1 Application for Approval of Plans and Specifications.
Authority: Health and Safety Code Section 16022.
Reference: Health and Safety Code Sections 16001 and 16011.
4-225 Designation of Responsibility
In addition to the requirements of Section 4-209, Article 1 of these regulations, the following provisions shall apply;
  1. Delegation of responsibility. The architect, structural engineer or civil engineer in general responsible charge shall employ or retain, under his/her supervision, registered mechanical and electrical engineers to design and observe the construction of the mechanical and electrical portions of the work when these elements are significant to the safety of the building or its occupants or the continuing functioning of the building. The requirement for observation of construction of the mechanical and electrical portions of the work by the mechanical and electrical engineers may be waived where the mechanical and electrical elements are not considered to be significant to the safety of the building or its occupants or its continuing functioning and when special mechanical and electrical inspection in accordance with Section 4-211 is provided.
    No delegation to or employment or retention of others shall be construed as relieving the architect, structural engineer or civil engineer in general responsible charge of his/her rights, duties and responsibilities under Section 16015 of the Act and Section 4-217 of these regulations.
  2. Assumption of responsibility. The architect, structural engineer or civil engineer who submits for approval plans and specifications for any project or any portion of any project which have been prepared by others shall assume responsibility for the safety of design of the completed construction and for the interpretation of and any necessary amplification of the plans and specifications of the project. He/she shall stamp and sign all plans submitted for approval to indicate his/her assumption of responsibility or may in lieu thereof, stamp and sign, and submit plans prepared under his/her own charge. (See Section 4-210 for other signatures.) When an architect, structural engineer or civil engineer accepts the responsibility for completion of a project or a portion of a project relinquished by another, that architect, structural engineer or civil engineer thereby assumes responsibility as follows:
    1. If the relinquishment occurs prior to the completion of the design documents, all responsibility shall be assumed. [See Section 4-225 (c) for the procedure.]
    2. If the relinquishment occurs after the design drawings and specifications have been completed and approved by the enforcement agency, the assuming architect or registered engineer shall be responsible for the construction of the project in accordance with the design of the relinquishing architect or engineer. The assuming architect or registered engineer shall assume responsibility for the interpretation of and any necessary amplification of the plans and specifications and shall stamp and sign any such documents prepared for that purpose.
  3. Acceptance of responsibility. The assumption of general responsible charge or of delegated responsibility shall be clearly outlined, accepted and approved by the parties concerned including the owner. The enforcement agency shall be notified when any change is made in the individuals in general responsible charge or delegated responsible charge.
    Form DSA-1, Application for Approval of Plans and Specifications, provides for the delegation of responsibility, but for unusual cases, or for changes in responsibility taking place after the plans have been submitted for approval, the delegation of responsibility, acceptances and approvals thereof, shall be submitted in letter form, which shall include an indication that the owner has been notified.
Authority: Health and Safety Code Section 16022.
Reference: Health and Safety Code Sections 16011 and 16015.
4-226 Alternates in General Responsible Charge or Delegated Responsible Charge
Alternates may be named on Form DSA-1, Application for Approval of Plans and Specifications, or in letter form. Letter forms shall be submitted to DSA prior to performance of work by the alternate and shall include an indication that the owner has been notified.
Authority: Health and Safety Code Section 16022.
Reference: Health and Safety Code Section 16015.
4-227 Estimate of Cost
Estimates of cost shall be based on the cost of construction prevailing at the time the plans and specifications for the project are submitted to DSA. The estimated cost of a project shall be increased as necessary to include the estimated cost of every alternate building or portion thereof shown on the plans and specifications as if each alternate building and portion were to be constructed separately and simultaneously.
When a contract amount, or the cumulative total of two or more contract amounts, exceeds the estimated cost by more than 30 percent, the estimated cost shall be revised. An additional fee based on the contract amount shall be paid before proceeding with the work. When the actual cost of constructing all the work shown on the approved plans is less than 70 percent of the estimated cost, a refund of overpaid fees may be claimed. (See Section 4-232 for actual cost.)
Authority: Health and Safety Code Section 16022.
Reference: Health and Safety Code Sections 16009 and 16011.
4-228 Procedure for Approval of Application and Voidance of Application
  1. General. After DSA has completed its review of the documents submitted with the application, the checked prints of the plans and specifications with the requests for corrections and/or additional information noted thereon shall be returned to the responsible architect or registered engineer. When plans and/or specifications require extensive corrections, a corrected set of prints of the plans and specifications shall be submitted for review if requested by DSA.
    When the requested corrections have been made and/or the additional information as requested has been provided by the responsible architect or registered engineer, an employee representative of the architect or registered engineer shall return the check set of plans and specifications along with the original plan tracings, the corrected specification pages and specification master cover sheet to DSA for backchecking. The backcheck is a comparison of the corrected plans and specifications with the check set of plans and specifications and shall be accomplished either by a conference at the DSA office between the architect or registered engineer or his/her employee representative and the checking engineer or by mail in the case of minor corrections to which all parties have agreed.
    Changes in plans and specifications, other than changes necessary for correction, made after submission for approval shall be brought to the attention of DSA in writing or by submission of revised plans identifying those changes clearly at the time of back-checking. Failure to give such notice may result in the voidance of any subsequent approval given to the plans and specifications.
    All requested corrections shall be made, additional requested information furnished or original designs justified and a list of materials to be tested and special inspections to be made shall be supplied to DSA at the time of backcheck. When DSA deems that the corrected plans and specifications comply with these regulations and all parts of Title 24, CCR, that pertain to essential services building construction, DSA shall place its stamp of identification on the reproducible sheets of drawings and master cover sheet of the specifications. This stamp is affixed for purposes of identification only and shall not be construed as authorization to let the construction contracts.
    One set of prints of the stamped plans and specifications shall be submitted to DSA. The submittal of the stamped prints of the plans and specifications is required before DSA will issue the written notice of approval of the application.
  2. Approval of the application. DSA shall issue to the owner of the essential services building a letter approving the application for the project upon receipt of the stamped copies of the approved plans and specifications. This letter shall constitute the approval of drawings and specifications as required by Section 16016 of the Health and Safety Code. No construction or fabrication work on an essential services building project shall commence until this approval in writing has been obtained.
    DSA will retain one set of the stamped plans and specifications and other pertinent project information in its files as a permanent record of the compliance of the approved project documents.
  3. Voidance of the application. Any change, erasure, alteration or modification of any plans or specifications bearing the identification stamp of DSA may result in voidance of the approval of the application. However, the "written approval of plans" may be extended by DSA to include revised plans and specifications after documents are submitted for review and approved. (See Section 4-233 for revised plans and Section 4-215 for addenda and construction change documents.)
    The procedures leading to written approval of plans shall be carried to conclusion without suspension or unnecessary delay. The application shall be void where either (1) prints from corrected plans or corrected original plans are not filed for backcheck and the backcheck is not completed within six months after the date of return of the checked plans to the architect or registered engineer, or (2) prints of the stamped plans and one set of the stamped specifications are not submitted to DSA files within two months after the date shown on the stamp of identification.
Authority: Health and Safety Code Section 16022.
Reference: Health and Safety Code Sections 16009, 16011 and 16013.
4-229 Deferred Approvals
Where a portion of the construction cannot be adequately detailed on the approved plans because of variations in product design and manufacture, the approval of plans for such portion, when specifically accepted by the enforcement agency, may be deferred until the material suppliers are selected provided the following conditions are met:
  1. The project plans clearly indicate that a deferred approval by the enforcement agency prior to the fabrication and installation is required for the indicated portions of the work.
  2. The project plans and specifications adequately describe the performance and loading criteria for such work.
  3. An architect or registered engineer stamps and signs the plans and specifications for the deferred approval items. The architect or engineer in general responsible charge of the design of the project shall submit the plans and specifications for the deferred approval item to the enforcement agency, with notation indicating that the deferred approval documents have been found to be in general conformance with the design of the building.
  4. Deferred approval shall not apply to the requirements of Section 4-210 (b), (c) and (d) with regard to the vertical and lateral load resisting systems and elements of the building. The plans, details, specifications and computations for the structural portions of the building shall provide sufficient information to permit a complete review when the project is submitted.
Authority: Health and Safety Code Section 16022.
Reference: Health and Safety Code Sections 16009, 16011, 16012, 16013 and 16014.
4-230 Withdrawal of Application
If a request is made by the owner of an essential services building for cancellation of the application and return of the plans and specifications, together with the fee paid, it will be granted only when the review of plans and specifications has not actually started. If the review of the plans and specifications has started, 30 percent of the paid fee will be refunded or applied to a new application for the same project.
No refund will be allowed for projects upon which only the minimum fee has been paid. No refund will be allowed after a contract has been let for any portion of the work except as provided in Section 4-228.
Authority: Health and Safety Code Section 16022.
Reference: Health and Safety Code Section 16009.
See More

Related Code Sections

1.2.1.1 Scope and Administration, State Building
For purposes of this code, a "state building" is a structure for which a state agency or state entity has authority to construct, alter, enlarge ...
1.2.1.1 Scope and Administration, State Building
For purposes of this code, a "state building" is a structure for which a state agency or state entity has authority to construct, alter, enlarge ...
1.2.1.1 Scope and Administration, State Building
For purposes of this code, a "state building" is a structure for which a state agency or state entity has authority to construct, alter, enlarge ...
1.2.1.1 Administration, State Building
For purposes of this code, a "state building" is a structure for which a state agency or state entity has authority to construct, alter, enlarge ...
1.2.1.1 Administration, State Building
For purposes of this code, a "state building" is a structure for which a state agency or state entity has authority to construct, alter, enlarge ...