UpCodes logo
Jump To Full Code Chapter
After successful wet testing and once sufficient influent is established for continuous operation, the system shall be placed into start-up mode for a minimum of two weeks. An effluent sample from the treatment system shall be collected and shall meet the water quality requirements of Table C102.1. If the sample does not meet the water quality requirements of Table C102.1 it shall be recorded and included in the final start-up test report. Successful start-up tests shall demonstrate 100 percent compliance with the water quality requirements of Table C102.1.

Related Code Sections

C102.8.2 Water Recycling Systems, Start-Up Testing
After successful wet testing and once sufficient influent is established for continuous operation, the system shall be placed into start-up mode ...
C103.12.2 Water Recycling Systems, Start-Up Testing
After successful wet testing and once sufficient influent is established for continuous operation, the system shall be placed into start-up mode ...
§28-314.3 Maintenance of Buildings, Inspection and Testing Process
The wastewater recycling system shall be placed into start-up mode and testing shall commence for at least five consecutive days demonstrating full ...
Article 314 Maintenance of Buildings, Periodic Wastewater Recycling System Inspection and Testing
plumbing code. The wastewater recycling system shall be placed into start-up mode and testing shall commence for at least five consecutive days ...