• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1910.106(g)(6)(iii) Special Room

OSHA 1910 General Industry > H Hazardous Materials > 1910.106 Flammable Liquids > 1910.106(g) Service Stations > 1910.106(g)(6) Heating Equipment > 1910.106(g)(6)(iii) Special Room
JUMP TO FULL CODE CHAPTER
Heating equipment may be installed in a special room separated from an area classified by Table H-19 by walls having a fire resistance rating of at least 1 hour and without any openings in the walls within 8 feet of the floor into an area classified in Table H-19. This room shall not be used for combustible storage and all air for combustion purposes shall come from outside the building.

Related Code Sections


1910.103(b)(3)(iii) Hazardous Materials, Special Rooms
Floor, walls, and ceiling shall have a fire-resistance rating of at least 2 hours. Walls or partitions shall be continuous from floor to ceiling ...
OSHA 1910 General Industry > H Hazardous Materials > 1910.103 Hydrogen > 1910.103(b) Gaseous Hydrogen Systems > 1910.103(b)(3) Design Consideration at Specific Locations > 1910.103(b)(3)(iii) Special Rooms
1910.106(g)(6)(iii) Hazardous Materials, Special Room
Heating equipment may be installed in a special room separated from an area classified by Table H-19 by walls having a fire resistance rating ...
OSHA 1910 General Industry > H Hazardous Materials > 1910.106 Flammable Liquids > 1910.106(g) Service Stations > 1910.106(g)(6) Heating Equipment > 1910.106(g)(6)(iii) Special Room
1910.103(c)(3)(iii)(e) Hazardous Materials,
)(b) of this section shall apply to all electrical wiring and equipment in the special room ...
OSHA 1910 General Industry > H Hazardous Materials > 1910.103 Hydrogen > 1910.103(c) Liquefied Hydrogen Systems > 1910.103(c)(3) Design Considerations at Specific Locations > 1910.103(c)(3)(iii) Special Rooms > 1910.103(c)(3)(iii)(e)
1910.103(c)(3)(iii)(c) Hazardous Materials,
of room volume and may consist of any one or any combination of the following: Walls of light noncombustible material; lightly fastened hatch covers ...
OSHA 1910 General Industry > H Hazardous Materials > 1910.103 Hydrogen > 1910.103(c) Liquefied Hydrogen Systems > 1910.103(c)(3) Design Considerations at Specific Locations > 1910.103(c)(3)(iii) Special Rooms > 1910.103(c)(3)(iii)(c)
1910.103(b)(3)(iii)(a) Hazardous Materials,
Floor, walls, and ceiling shall have a fire-resistance rating of at least 2 hours. Walls or partitions shall be continuous from floor to ceiling ...
OSHA 1910 General Industry > H Hazardous Materials > 1910.103 Hydrogen > 1910.103(b) Gaseous Hydrogen Systems > 1910.103(b)(3) Design Consideration at Specific Locations > 1910.103(b)(3)(iii) Special Rooms > 1910.103(b)(3)(iii)(a)
Help Contact Us Privacy Terms
Code Compare
Code Compare
Highlight differences between any two building codes.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING