[OSHPD 1R, 2 & 5] All fills used to support the foundations of any building or structure shall be continuously inspected by the geotechnical engineer or his or her qualified representative. It shall be the responsibility of the geotechnical engineer to verify that fills meet the requirements of the approved construction documents and to coordinate all fill inspection and testing during construction involving such fills.
The duties of the geotechnical engineer or his or her qualified representative shall include, but need not be limited to, the inspection of cleared areas and benches prepared to receive fill; inspection of the removal of all unsuitable soils and other materials; the approval of soils to be used as fill material; the inspection of placement and compaction of fill materials; the testing of the completed fills; and the inspection or review of geotechnical drainage devices, buttress fills or other similar protective measures in accordance with the approved construction documents.
A verified report shall be submitted by the geotechnical engineer as required by the California Administrative Code. The report shall indicate that all tests and inspections required by the approved construction documents were completed and whether the tested materials and/or inspected work meet the requirements of the approved construction documents.
Upcodes Diagrams

Related Code Sections

1705.6.1 Special Inspections and Tests, Soil Fill
prepared to receive fill; inspection of the removal of all unsuitable soils and other materials; the approval of soils to be used as fill material ...
1705A.6.1 Special Inspections and Tests, Soil Fill
fill; inspection of the removal of all unsuitable soils and other materials; the approval of soils to be used as fill material; the inspection ...
1705A.6.1 Special Inspections and Tests, Soil Fill
fill; inspection of the removal of all unsuitable soils and other materials; the approval of soils to be used as fill material; the inspection ...
1705.6.1 Special Inspections and Tests, Soil Fill
prepared to receive fill; inspection of the removal of all unsuitable soils and other materials; the approval of soils to be used as fill material ...
1705A.6.1 Special Inspections and Tests, Soil Fill
to receive fill; inspection of the removal of all unsuitable soils and other materials; the approval of soils to be used as fill material; the inspection ...