Where slurry is utilized to support an excavation, trench, or drilled or bored hole, slurry mix proportions and installation procedures shall be provided by a registered design professional on signed and sealed design and installation procedures. The installation procedures shall account for all imposed loads, including those from the earth, adjacent structures, and adjacent equipment. Where construction documents are required for the support of excavation by Section 3304.4.1, slurry mix proportions, slurry installation procedures, and slurry parameters necessary for stability, including but not limited to viscosity, unit weight, fluid loss, sand content, and pH, shall be indicated on such construction documents. The use of slurry to support excavations shall be subject to special inspection in accordance with Chapter 17
Upcodes Diagrams

Related Code Sections

1704.20.2.1 Structural Tests and Special Inspections, Slurry
The proportions and installation of slurry mixtures to protect the sides of excavations shall be subject to special inspection. Slurry mix ...
1705.25.3.1 Special Inspections and Tests, Slurry
The proportions and installation of slurry mixtures to protect the sides of excavations shall be subject to special inspection. Slurry mix ...
3304.12 Safeguards During Construction or Demolition, Slurry
Where slurry is utilized to support an excavation, trench, or drilled or bored hole, slurry mix proportions and installation procedures shall ...
3304.12 Safeguards During Construction or Demolition, Slurry
Where slurry is utilized to support an excavation, trench, or drill or bore hold, slurry mix proportions and installation procedures shall ...
1805.5 Soils and Foundations, In Situ Walls
In situ walls (such as slurry walls, tangent pile walls, and secant pile walls) with joints sealed by grouting or other methods acceptable ...