// CODE SNIPPET
230.74 Simultaneous Opening of Poles
Go To Full Code Chapter
Each service disconnect shall simultaneously disconnect all ungrounded service conductors that it controls from the premises wiring system.
Upcodes Diagrams
Related Code Sections
(B) Wiring and Protection, Simultaneous Opening of Poles
Each building or structure disconnecting means shall simultaneously disconnect all ungrounded supply conductors that it controls from the building ...
(B) Wiring and Protection, Simultaneous Opening of Poles
Each building or structure disconnecting means shall simultaneously disconnect all ungrounded supply conductors that it controls from the building ...
230.74 Wiring and Protection, Simultaneous Opening of Poles
Each service disconnect shall simultaneously disconnect all ungrounded service conductors that it controls from the premises wiring system ...
230.74 Wiring and Protection, Simultaneous Opening of Poles
Each service disconnect shall simultaneously disconnect all ungrounded service conductors that it controls from the premises wiring system ...
430.85 Equipment for General Use, In Grounded Conductors
in the grounded conductor cannot be opened without simultaneously opening all conductors of the circuit ...