// CODE SNIPPET
3304.4.1 Shoring and Bracing and Sheeting
Go To Full Code Chapter
For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm.
Note for Table 3304.4.1 (1): A steel sheet piling and bracing of equivalent strength may be substituted for wood sheet piling and timber bracing.
For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm.
Note for Table 3304.4.1 (2): A steel sheet piling and bracing of equivalent strength may be substituted for wood sheet piling and timber bracing.
The sides of all excavations, including related or resulting embankments, that are 5 feet (1524 mm) or greater in depth or height measured from the level of the adjacent ground surface to the deepest point of the excavation, shall be protected and maintained by shoring, bracing, sheeting, sheet piling, or by other retaining structures as may be necessary to prevent the sides of the excavation from caving in before permanent supports are provided. Such methods of protection shall be subject to special inspection in accordance with the provisions of Chapter 17.
Alternatively, excavation sides may be sloped not steeper than 45 degrees or stepped so that the average slope is not steeper than 45 degrees with no step more than 5 feet (1524 mm) high, provided such slope does not endanger any structure, including subsurface structures. Deviation from the foregoing limitations for cut slopes shall be permitted only upon the completion of a soil investigation report acceptable to the commissioner.
Alternatively, excavation sides may be sloped not steeper than 45 degrees or stepped so that the average slope is not steeper than 45 degrees with no step more than 5 feet (1524 mm) high, provided such slope does not endanger any structure, including subsurface structures. Deviation from the foregoing limitations for cut slopes shall be permitted only upon the completion of a soil investigation report acceptable to the commissioner.
Exception: Rock cut excavation.
3304.4.1.1 Sheet Piling and Bracing
Sheet piling and bracing used in trench excavations shall be at least equivalent in strength to that specified in Tables 3304.4.1.1(1) and 3304.4.1.1(2).
SHEET PILING | STRINGERS | CROSS BRACING | ||||
Depth of trench (ft.) |
Size (in.) |
Horizontal,spacing (ft.) |
Size (in.) |
Vertical spacing (ft.) |
Size (in.) |
Horizontal spacing (ft.) |
Hard and solid soild | ||||||
5-10 10-15 More than 15 |
2 x 6 2 x 6 2 x 6 |
6 4 tight |
2 x 6 2 x 6 4 x 8 |
6 4 6 |
2 x 6 2 x 6 4 x 8 |
6 4 6 |
Soil likely to crack or crumble | ||||||
5-10 10-15 More than 15 |
2 x 6 2 x 6 2 x 6 |
3 2 tight |
2 x 6 2 x 6 4 x 10 |
5 4 4 |
2 x 6 2 x 6 4 x 10 |
5 4 6 |
Soft, sandy filled-in loose soil | ||||||
5 - 10 10 - 15 More than 15 |
2 x 6 2 x 6 2 x 6 |
tight tight tight |
4 x 6 4 x 6 4 x 12 |
6 5 4 |
4 x 6 4 x 6 4 x 12 |
6 6 6 |
Where hydrostatic pressure exists | ||||||
Top 10 More than 10 |
2 x 6 3 x 6 |
tight tight |
6 x 8 6 x 10 |
4 4 |
6 x 8 6 x 10 |
6 6 |
For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm.
Note for Table 3304.4.1 (1): A steel sheet piling and bracing of equivalent strength may be substituted for wood sheet piling and timber bracing.
SHEET PILING | STRINGERS | CROSS BRACING | ||||
Depth of trench (ft.) |
Size (in.) |
Horizontal,spacing (ft.) |
Size (in.) |
Vertical spacing (ft.) |
Size (in.) |
Horizontal spacing (ft.) |
Hard and solid soild | ||||||
5-10 10-15 More than 20 |
2 x 6 2 x 6 2 x 6 |
6 tight tight |
4 x 6 6 x 6 6 x 8 |
4 4 4 |
4 x 6 6 x 6 6 x 8 |
6 6 6 |
Soil likely to crack or crumble | ||||||
5-10 10-120 More than 20 |
2 x 6 2 x 6 2 x 6 |
3 tight tight |
4 x 6 6 x 6 6 x 8 |
4 4 4 |
4 x 6 6 x 6 6 x 8 |
6 6 6 |
Soft, sandy filled-in loose soil | ||||||
5 - 10 10 - 20 More than 20 |
2 x 6 2 x 6 2 x 6 |
tight tight tight |
4 x 6 6 x 6 6 x 8 |
4 4 4 |
4 x 6 6 x 6 6 x 8 |
6 6 6 |
Where hydrostatic pressure exists | ||||||
Top 10 More than 10 |
2 x 6 3 x 6 |
tight tight |
6 x 8 6 x 10 |
4 4 |
6 x 8 6 x 10 |
6 6 |
For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm.
Note for Table 3304.4.1 (2): A steel sheet piling and bracing of equivalent strength may be substituted for wood sheet piling and timber bracing.
Related Code Sections
3304.4.1 Safeguards During Construction or Demolition, Shoring and Bracing and Sheeting
the level of the adjacent ground surface to the deepest point of the excavation, shall be protected and maintained by shoring, bracing, sheeting, sheet ...
3306.10.1 Safeguards During Construction or Demolition, Evaluation of Fill on Adjoining Foundations
to the placement of the fill. If necessary, sheeting, shoring, or bracing shall be provided as
indicated by the registered design professional ...
§28-105.2.1 Administration, Submittal Documents Required for Foundations and Earthwork
of excavation design, including but not limited to stepping, sheeting, sloping, shoring, and bracing, and any protective railings or equipment required ...
§28-105.2.1 Administration, Submittal Documents Required for Foundations and Earthwork
of excavation design, including but not limited to stepping, sheeting, sloping, shoring, and bracing, and any protective railings or equipment required ...
3306.9.11.3 Safeguards During Construction or Demolition, Cellar Storage
Debris stored in the cellar shall not be piled above the level of the adjacent exterior grade unless the contractor provides sheet-piling, shoring ...