AS105.6.7 Separation of Exterior Plaster and Earth
Go To Full Code Chapter
Exterior plaster applied to straw bales shall be located not less than 6 inches (102 mm) above earth or 3 inches (51 mm) above paved areas.
Upcodes Diagrams
Related Code Sections
AS105.6.7 Strawbale Construction, Separation of Exterior Plaster and Earth
Exterior plaster applied to straw bales shall be located not less than 6 inches (102 mm) above earth or 3 inches (51 mm) above paved areas ...
AS105.6.7 Strawbale Construction, Separation of Exterior Plaster and Earth
Exterior plaster applied to straw bales shall be located not less than 6 inches (102 mm) above earth or 3 inches (51 mm) above paved areas ...
AS105.6.7 Strawbale Construction, Separation of Exterior Plaster and Earth
Exterior plaster applied to straw bales shall be located not less than 6 inches (102 mm) above earth or 3 inches (51 mm) above paved areas ...
R703.7.2 Wall Covering, Plaster
coats, provided the total thickness is as set forth in Table R702.1(1). On wood-frame construction with an on-grade floor slab system, exterior plaster ...
R703.7.2 Wall Covering, Plaster
, provided the total thickness is as set forth in Table R702.1(1). On wood-frame construction with an on-grade floor slab system, exterior plaster shall ...