// CODE SNIPPET
4-337 Semimonthly Reports
Go To Full Code Chapter
In addition to the verified reports (Section 4-336) the project inspector shall make semimonthly reports of the progress of construction to the architect or registered engineer in general responsible charge and the structural engineer if delegated to observe the structural portion of the construction. A copy of each such report shall be sent to the school board and DSA, and a copy kept in the project inspector's job file.
Semimonthly reports shall state the name of the building, the school and the school district, and give the file and application number. The reports shall include a list of official visitors to the project and whom they represent, a brief statement of the work done, instructions received from the architect or registered engineer during the period covered by the report and pertinent information regarding any unusual conditions or questions that may have arisen at the job. The semimonthly report shall include problems or noncomplying conditions that have occurred on the project and how they were resolved or brought into compliance. Failure to comply with this section, in a timely manner, may be cause for DSA to withdraw approval of the inspector.
Authority: Education Code Sections 17310 and 81142.
Reference: Education Code Sections 17280, 17309, 17310, 81130, 81141 and 81142.
- (OSA/SS 1/92) Regular order by the Office of the State Architect/Structural Safety Section to amend Section 4-337, Part 1, Title 24, C.C.R. Filed with the Secretary of State on December 15, 1992; effective July 1, 1993. Approved by the California Building Standards Commission on December 9, 1992.
Upcodes Diagrams
Related Code Sections
4-337 Administrative Regulations for the Division of the State Architect—Structural Safety (DSA-SS), Semimonthly Reports
In addition to the verified reports (Section 4-336) the project inspector shall make semimonthly reports of the progress of construction ...
4-337 Administrative Regulations for the Division of the State Architect—Structural Safety (DSA-SS), Semimonthly Reports
In addition to the verified reports (Section 4-336) the project inspector shall make semimonthly reports of the progress of construction ...
4-337 Safety of Construction of Public Schools, Semimonthly Reports
of the construction. A copy of each such report shall be sent to the school board and DSA, and a copy kept in the project inspector's job file. Semimonthly reports ...
4-241 Administrative Regulations for the Division of the State Architect—Structural Safety (DSA-SS), Project Inspector's Semimonthly Reports
In addition to the verified reports required in Section 4-214, the project inspector shall make semimonthly reports of the progress of construction ...
4-241 Administrative Regulations for the Division of the State Architect—Structural Safety (DSA-SS), Project Inspector's Semimonthly Reports
In addition to the verified reports required in Section 4-214, the project inspector shall make semimonthly reports of the progress of construction ...