UpCodes logo
Jump To Full Code Chapter
3102F.3.3.1 Initial Audit
For a new MOT or new berthing system(s), the initial audit of the "as-built" systems(s) shall be performed prior to commencement of operations.
3102F.3.3.2 Subsequent Audits
A subsequent audit of each terminal shall be completed concurrently with the inspections (see Section 3102F.3.5). The audit team leader shall recommend either: (1) a default subsequent audit interval of 4 years, or (2) an alternate interval, based on assessments of the structural, mechanical and electrical systems, and consideration of:
  1. The extent of the latest deterioration and/or disrepair,
  2. The rate of future anticipated deterioration and/or disrepair,
  3. The underwater inspection guidance provided in Table 31F-2-1, and
  4. Other specified factors.
Based on independent assessment of these factors, the Division may accept the audit team leader's recommendation or require a different subsequent audit interval.
If there are no changes in the defined purpose (see Section 3102F.3.6.1) of the berthing system(s), relevant prior analyses may be referenced. However, if there is a significant change in the operations or condition of berthing system(s), a new analysis may be required.
The Division may require an audit, inspection or supplemental evaluations to justify changes in the use of the berthing system(s).

Related Code Sections

1203.4.2 Energy Systems, Schedule
Inspection, testing and maintenance of emergency and standby power systems shall be in accordance with an approved schedule established upon ...
1203.4.2 Energy Systems, Schedule
Inspection, testing and maintenance of emergency and standby power systems shall be in accordance with an approved schedule established upon ...
3102F.3.3 [SLC] Marine Oil Terminals, Schedule
For a new MOT or new berthing system(s), the initial audit of the "as-built" systems(s) shall be performed prior to commencement of operations ...
3102F.3.3 [SLC] Marine Oil Terminals, Schedule
For a new MOT or new berthing system(s), the initial audit of the "as-built" systems(s) shall be performed prior to commencement of operations ...
3102F.3.3 [SLC] Marine Oil Terminals, Schedule
For a new MOT or new berthing system(s), the initial audit of the "as-built" systems(s) shall be performed prior to commencement of operations ...