UpCodes logo
Go To Full Code Chapter
No certificate of occupancy shall be issued until the department confirms by inspection that all work relating to the installation of the part of the sanitary/storm water drainage system which lies outside of such property, if and as required by section 24-526 of the administrative code, has been satisfactorily completed.

Related Code Sections

§28-118.8 Administration, Sanitary/Storm Water Drainage
of the sanitary/storm water drainage system which lies outside of such property, if and as required by section 24-526 of the administrative code, has been ...
§28-118.8 Administration, Sanitary/Storm Water Drainage
of the sanitary/storm water drainage system which lies outside of such property, if and as required by section 24-526 of the administrative code, has been ...
§28-118.8 Administration, Sanitary/Storm Water Drainage
of the sanitary/storm water drainage system which lies outside of such property, if and as required by section 24-526 of the administrative code, has been ...
Reference Standard 16 Plumbing and Gas Piping [PDF] (page 52)
-Where separate systems of sanitary drainage and storm water drainage are installed in the same property, the storm and sanitary building sewers and drains ...
§27-896 Plumbing and Gas Piping, Scope
, and maintenance of plumbing systems, including gas piping, sanitary and storm drainage, industrial and special wastes, sanitary facilities, water supplies ...