UpCodes logo
Jump To Full Code Chapter
Rough-in inspections shall be made when all building framing and parts of the electrical, plumbing, fire protection, or heating-ventilation or cooling system that will be hidden from view in the finished building have been placed, but before any wall, ceiling finish, or building insulation is installed.
Commentary: Plumbing, mechanical, and electrical components installed underground should be considered as rough-in inspections and may be inspected at any point during construction prior to covering.

Related Code Sections

107.1.4 Administrative Code, Rough-in Inspection
Rough-in inspections shall be made when all building framing and parts of the electrical, plumbing, fire protection, or heating-ventilation ...
107.1.4 Administrative Code, Rough-in Inspection
Rough-in inspections shall be made when all building framing and parts of the electrical, plumbing, fire protection, or heating-ventilation ...