306.2.2 Rock Removal
JUMP TO FULL CODE CHAPTER
Where rock is encountered in trenching, the rock shall be removed to not less than 3 inches (76 mm) below the installation level of the bottom of the pipe, and the trench shall be backfilled to the installation level of the bottom of the pipe with sand tamped in place so as to provide uniform load-bearing support for the pipe between joints. The pipe, including the joints, shall not rest on rock at any point.
Related Code Sections
306.2.2 General Regulations, Rock Removal
Where rock is encountered in trenching, the rock shall be removed to not less than 3 inches (76 mm) below the installation level of the bottom ...
2014 FBC - Plumbing, 5th edition > 3 General Regulations > 306 Trenching, Excavation and Backfill > 306.2 Trenching and Bedding > 306.2.2 Rock Removal
306.2.2 General Regulations, Rock Removal
Where rock is encountered in trenching, the rock shall be removed to not less than 3 inches (76 mm) below the installation level of the bottom ...
2017 FBC - Plumbing, 6th edition > 3 General Regulations > 306 Trenching, Excavation and Backfill > 306.2 Trenching and Bedding > 306.2.2 Rock Removal
306.2.2 General Regulations, Rock Removal
Where rock is encountered in trenching, the rock shall be removed to not less than 3 inches (76 mm) below the installation level of the bottom ...
2020 FBC - Plumbing, 7th edition > 3 General Regulations > 306 Trenching, Excavation and Backfill > 306.2 Trenching and Bedding > 306.2.2 Rock Removal
Section 306 General Regulations, Trenching, Excavation and Backfill
Where rock is encountered in trenching, the rock shall be removed to not less than 3 ...
1803.5.6 Soils and Foundations, Rock Strata
Where subsurface explorations at the project site indicate variations in the structure of rock upon which foundations are to be constructed ...
2017 FBC - Building, 6th edition > 18 Soils and Foundations > 1803 Geotechnical Investigations > 1803.5 Investigated Conditions > 1803.5.6 Rock Strata