7-143 Responsibility of the Contractor
Go To Full Code Chapter
- The contractor shall complete the work in accordance with the approved construction documents. The contractor shall not be relieved of any responsibility by the activities of the architect, engineer, inspector or the Office in the performance of their duties.
- The contractor shall submit verified compliance reports to the Office in accordance with Section 7-151.
- Where no general contractor is involved, the governing body or authority of a health facility shall designate an agent who shall be responsible for the construction of the project in accordance with the approved contract documents and such agent shall submit the verified reports to the Office.
Authority: Health and Safety Code Sections 127015 and 129850.
Reference: Health and Safety Code Sections 129675—129998.
- (OSHPD 2/95) Regular order by the Office of Statewide Health Planning and Development to amend Section 7-143. Filed with the secretary of state on August 14, 1996, becomes effective September 13, 1996. Approved by the California Building Standards Commission on March 19, 1996.
Upcodes Diagrams
Related Code Sections
7-143 Safety Standards for Health Facilities, Responsibility of the Contractor
responsibility by the activities of the architect, engineer, inspector or the Office in the performance of their duties. The contractor shall submit verified ...
7-143 Safety Standards for Health Facilities, Responsibility of the Contractor
responsibility by the activities of the architect, engineer, inspector or the Office in the performance of their duties. The contractor shall submit verified ...
7-143 Safety Standards for Health Facilities, Responsibility of the Contractor
responsibility by the activities of the architect, engineer, inspector or the Office in the performance of their duties. (b) The contractor shall submit ...
1704.4 Special Inspections and Tests, Contractor Responsibility
Each contractor responsible for the construction of a main wind- or seismic force-resisting system, designated seismic system or a wind- or seismic ...
1704.4 Special Inspections and Tests, Contractor Responsibility
Each contractor responsible for the construction of a main wind- or seismic force-resisting system, designated seismic system or a wind- or seismic ...