UpCodes logo
Jump To Full Code Chapter
The inter-story drift between floors of the building and the corresponding strains in building components shall be checked at the performance point to verify acceptability under the demand earthquake ground motion. Performance shall be considered acceptable if building response parameters do not exceed the limitations outlined in Section A509.1.2.

Related Code Sections

1206.8.2 Energy Systems, Special Expert
authorized agent as the person in responsible charge of the limited or focused activity ...
608.8 Building Services and Systems, Peer Review
may be employed by the owner or the owner's authorized agent as the person in responsible charge of the limited or focused activity ...
24.3.11.4 Emergency Communications Systems (ECS),
The risk analysis shall be permitted to be limited in scope to address the communication requirements of an existing emergency response plan ...