• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

Section 21.1306 — Residue, Popping and Pitting

Los Angeles Existing Building Code > Referenced Standards > 21-13 Hydrated Lime for Masonry Purposes > 21.1306 — Residue, Popping and Pitting
JUMP TO FULL CODE CHAPTER

The four types of hydrated lime for masonry purposes shall conform to one of the following requirements:

  1. The residue retained on a No. 30 (600 μm) sieve shall not be more than 0.5 percent, or
  2. If the residue retained on a No. 30 (600 μm) sieve is over 0.5 percent, the lime shall show no pops and pits when tested.

Related Code Sections


Section 21.1306 Referenced Standards, — Residue, Popping and Pitting
) sieve shall not be more than 0.5 percent, or If the residue retained on a No. 30 (600 μm) sieve is over 0.5 percent, the lime shall show no pops ...
Los Angeles Existing Building Code > Referenced Standards > 21-13 Hydrated Lime for Masonry Purposes > 21.1306 — Residue, Popping and Pitting
2403.4.2 Flammable Finishes, Residue
Residues removed during cleaning and debris contaminated with residue shall be immediately removed from the premises and properly disposed ...
2017 LA City Fire Code > 24 Flammable Finishes > 2403 Protection of Operations > 2403.4 Operations and Maintenance > 2403.4.2 Residue
11.2.2.6* Design Approaches, Residual Pressure
The residual pressure requirement of Table 11.2.2.1 shall be met at the elevation of the highest sprinkler ...
Standard for the Installation of Sprinkler Systems 2016 of Los Angeles > 11 Design Approaches > 11.2 Occupancy Hazard Fire Control Approach for Spray Sprinklers > 11.2.2 Water Demand Requirements — Pipe Schedule Method > 11.2.2.6* Residual Pressure
2408.4.3 Flammable Finishes, Residue Control
Materials shall not be contaminated by dusts and overspray residues resulting from the sanding or spraying of finishing materials containing organic ...
2017 LA City Fire Code > 24 Flammable Finishes > 2408 Organic Peroxides and Dual-Component Coatings > 2408.4 Housekeeping, Maintenance, Storage and Use of Hazardous Materials > 2408.4.3 Residue Control
3.8.1.9.1 Definitions, Residual Pressure.
The pressure that exists in the distribution system, measured at the residual hydrant at the time the flow readings are taken at the flow hydrants ...
Standard for the Installation of Sprinkler Systems 2016 of Los Angeles > 3 Definitions > 3.8 Private Water Supply Piping Definitions > 3.8.1 General Definitions From NFPA 24 > 3.8.1.9 Pressure. > 3.8.1.9.1 Residual Pressure.
Help Contact Us Privacy Terms
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE