3305.3.6.8 Reshoring Schedule
JUMP TO FULL CODE CHAPTER
A signed and sealed reshoring schedule shall be provided and maintained at the construction site whenever reshoring is employed.
Exception: A separate reshoring schedule is not required when the required reshoring information is covered on the approved construction documents prepared by the applicant of record.
Exception: A separate reshoring schedule is not required when the required reshoring information is covered on the approved construction documents prepared by the applicant of record.
Related Code Sections
3305.3.6.8 Safeguards During Construction or Demolition, Reshoring Schedule
A signed and sealed reshoring schedule shall be provided and maintained at the construction site whenever reshoring is employed. Exception: A ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3305 Material Placement and Installation > 3305.3 Concrete Formwork > 3305.3.6 Reshoring > 3305.3.6.8 Reshoring Schedule
3305.3.6.8 Safeguards During Construction or Demolition, Reshoring Schedule
A signed and sealed reshoring schedule shall be provided and maintained at the construction site whenever reshoring is employed. Exception: A ...
NYC Building Code 2022 > 33 Safeguards During Construction or Demolition > 3305 Material Placement and Installation > 3305.3 Concrete Formwork > 3305.3.6 Reshoring > 3305.3.6.8 Reshoring Schedule
1906.5.1 Concrete, Removal Schedule
Before starting construction, the contractor shall develop a procedure and schedule for removal of shores and installation of reshores ...
NYC Building Code 2008 > 19 Concrete > 1906 Formwork, Embedded Pipes and Construction Joints > 1906.5 Removal of Forms and Shoring > 1906.5.1 Removal Schedule
3305.3.5.1.1 Safeguards During Construction or Demolition, Data and Analysis
The structural analysis and concrete strength data used in planning and implementing form removal and reshoring shall be furnished by the registered ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3305 Material Placement and Installation > 3305.3 Concrete Formwork > 3305.3.5 Removal of Forms and Shoring > 3305.3.5.1 Removal Schedule > 3305.3.5.1.1 Data and Analysis
3305.3.5.1.1 Safeguards During Construction or Demolition, Data and Analysis
The structural analysis and concrete strength data used in planning and implementing form removal and reshoring shall be furnished by the registered ...
NYC Building Code 2022 > 33 Safeguards During Construction or Demolition > 3305 Material Placement and Installation > 3305.3 Concrete Formwork > 3305.3.5 Removal of Forms and Shoring > 3305.3.5.1 Removal Schedule > 3305.3.5.1.1 Data and Analysis