• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

§28-316.1 Required Insulation of Certain Concealed Piping Exposed During Alteration or Repair

NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 316 Insulation of Concealed Pipes Exposed During Alteration or Repair > §28-316.1 Required Insulation of Certain Concealed Piping Exposed During Alteration or Repair
JUMP TO FULL CODE CHAPTER
Where concealed existing piping is exposed in the course of the alteration or repair of a building, the owner of the building shall provide for the insulation of the exposed piping. The exposed piping shall be insulated to the extent required by the New York city energy conservation code for newly installed pipe of the same specifications and serving the same function as the exposed pipe. The entire exposed length of the piping shall be insulated as well as any further length of concealed pipe that can be directly accessed through openings made in the course of such alteration or repair.

Exceptions:
  1. Exposed pipe with one-inch (25-mm) thick continuous coverage of existing insulation in good condition.
  2. Where the length of concealed pipe which may be directly accessed through openings made in the course of such alteration or repair is less than three feet (914 mm).
  3. Where there is not sufficient space to insulate pipes to the extent required by the New York city energy conservation code due to conflicts with existing construction, pipes shall be insulated to the extent that space allows.

Related Code Sections


§28-316.1 Maintenance of Buildings, Required Insulation of Certain Concealed Piping Exposed During Alteration or Repair
Where concealed existing piping is exposed in the course of the alteration or repair of a building, the owner of the building shall provide ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 316 Insulation of Concealed Pipes Exposed During Alteration or Repair > §28-316.1 Required Insulation of Certain Concealed Piping Exposed During Alteration or Repair
§28-316.1 Maintenance of Buildings, Required Insulation of Certain Concealed Piping Exposed During Alteration or Repair
Where concealed existing piping is exposed in the course of the alteration or repair of a building, the owner of the building shall provide ...
NYC General Admin. Provisions 2022 > 3 Maintenance of Buildings > 316 Insulation of Concealed Pipes Exposed During Alteration or Repair > §28-316.1 Required Insulation of Certain Concealed Piping Exposed During Alteration or Repair
8.15.1 Installation Requirements, Concealed Spaces
Concealed spaces of exposed combustible construction shall be protected by sprinklers except in concealed spaces where sprinklers are not required ...
Standard for the Installation of Sprinkler Systems 2016 of New York City > 8 Installation Requirements > 8.15 Special Situations > 8.15.1 Concealed Spaces
*§28-321.2.2 Maintenance of Buildings, Prescriptive Energy Conservation Measures
applicable: Adjusting temperature set points for heat and hot water to reflect appropriate space occupancy and facility requirements; Repairing all ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > *321 Energy Conservation Measure Requirements for Certain Buildings > *§28-321.2 Required Energy Conservation Measures for Certain Buildings > *§28-321.2.2 Prescriptive Energy Conservation Measures
*§28-321.2.2 Maintenance of Buildings, Prescriptive Energy Conservation Measures
applicable: Adjusting temperature set points for heat and hot water to reflect appropriate space occupancy and facility requirements; Repairing all ...
NYC General Admin. Provisions 2022 > 3 Maintenance of Buildings > *321 Energy Conservation Measure Requirements for Certain Buildings > *§28-321.2 Required Energy Conservation Measures for Certain Buildings > *§28-321.2.2 Prescriptive Energy Conservation Measures
Help Contact Us Privacy Terms
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING