// CODE SNIPPET
R103.1.1.2.1.1 Reporting Schedule
JUMP TO FULL CODE CHAPTER
It shall be the responsibility of the local building official to forward the reporting section of the proper form to the entity representing the Florida Building Commission on a quarterly basis.
Related Code Sections
R103.1.1.2.1.1 [RE] Scope and Administration, Reporting Schedule
It shall be the responsibility of the local building official to forward the reporting section of the proper form to the entity representing ...
2020 FBC - Energy Conservation, 7th edition > 1 [RE] Scope and Administration > R103 Construction Documents > R103.1 General > R103.1.1 Compliance Certification > R103.1.1.2 Code Compliance Certification > R103.1.1.2.1 Reporting to Entity Representing the Florida Building Commission > R103.1.1.2.1.1 Reporting Schedule
R103.1.1.2.1.1 [RE] Scope and Administration, Reporting Schedule
It shall be the responsibility of the local building official to forward the reporting section of the proper form to the entity representing ...
2017 FBC - Energy Conservation, 6th edition > 1 [RE] Scope and Administration > R103 Construction Documents > R103.1 General > R103.1.1 Compliance Certification > R103.1.1.2 Code Compliance Certification > R103.1.1.2.1 Reporting to Entity Representing the Florida Building Commission > R103.1.1.2.1.1 Reporting Schedule
26.2.4.2* Supervising Station Alarm Systems,
to an operator as a nonrestored signal and shall be reported to the subscriber. Exception: This provision shall not apply to scheduled impairments ...
National Fire Alarm and Signaling Code 2016 of Florida > 26 Supervising Station Alarm Systems > 26.2 General > 26.2.4 Restoral Signals > 26.2.4.2*
C408.3.2 [CE] Commercial Energy Efficiency, Documentation Requirements
identified. A schedule for inspecting and recalibrating all lighting controls ...
2020 FBC - Energy Conservation, 7th edition > 4 [CE] Commercial Energy Efficiency > C408 Maintenance Information and System Commissioning > C408.3 Lighting Controls Functional Testing > C408.3.2 Documentation Requirements
60.5.1.17.2 Hazardous Materials,
fail in a fail-safe manner Where equipment, devices, and systems self-diagnose and report trouble, with records of the self-diagnosis and trouble ...
NFPA 1 part of the 2020 FFPC, 7th edition > 60 Hazardous Materials > 60.5 Fundamental Requirements > 60.5.1 General Requirements > 60.5.1.17 Testing > 60.5.1.17.2