Approved agencies shall keep records of special inspections and tests. The approved agency shall submit reports of special inspections and tests to the building official and to the registered design professional in responsible charge. Reports shall indicate that work inspected or tested was or was not completed in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If they are not corrected, the discrepancies shall be brought to the attention of the building official and to the registered design professional in responsible charge prior to the completion of that phase of the work. A final report documenting required special inspections and tests, and correction of any discrepancies noted in the inspections or tests, shall be submitted at a point in time agreed upon prior to the start of work by the owner or the owner's authorized agent to the building official.
Upcodes Diagrams

Related Code Sections

1011.1 Boilers, Water Heaters and Pressure Vessels, Tests
along with all manufacturer's data reports required by the ASME Boiler and Pressure Vessel Code shall be submitted to the code official ...
909.18.9 Fire Protection and Life Safety Systems, Identification and Documentation
and maintenance requirements, shall be maintained on file at the building as an attachment to the report required by Section 909.18.8.3. Devices shall have ...
909.18.9 Fire Protection and Life Safety Systems, Identification and Documentation
and maintenance requirements, shall be maintained on file at the building as an attachment to the report required by Section 909.18.8.3. Devices shall have ...