UpCodes logo
Go To Full Code Chapter
A report shall be issued by the approved agency following each condition assessment in accordance with sections 28-323.5.1 and 28-323.5.2.
§28-323.5.1 Contents
The report shall indicate the results of the condition assessment as safe, safe with repair and/or engineering monitoring, or unsafe, as prescribed by the rules of the department. It shall include a record of all potentially unsafe conditions of the structure and the condition of structural framing members, any visible reinforcement, connections, and conditions of slabs and slab joints. The report must also contain the annual observation checklist to be used for subsequent annual parking structure observations. Such report must be signed and sealed by a professional engineer, who must file the report.
§28-323.5.2 Submission Deadlines
Except as otherwise provided in section 28-323.7, the approved agency shall submit a written report to the commissioner within 60 days of completing the condition assessment, but not more than six years from the submission of the preceding report of condition assessment, certifying the results of the assessment as described in section 28-323.5.1.
Upcodes Diagrams

Related Code Sections

§28-323.5 Maintenance of Buildings, Report of Condition Assessment
A report shall be issued by the approved agency following each condition assessment in accordance with sections 28-323.5.1 and 28-323.5.2 ...