• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1926.755(b) Repair, Replacement or Field Modification of Anchor Rods (Anchor Bolts)

OSHA 1926 Construction > R Steel Erection > 1926.755 Column Anchorage > 1926.755(b) Repair, Replacement or Field Modification of Anchor Rods (Anchor Bolts)
JUMP TO FULL CODE CHAPTER

1926.755(b)(1)

Anchor rods (anchor bolts) shall not be repaired, replaced or field-modified without the approval of the project structural engineer of record.

1926.755(b)(2)

Prior to the erection of a column, the controlling contractor shall provide written notification to the steel erector if there has been any repair, replacement or modification of the anchor rods (anchor bolts) of that column.

[66 FR 5269, Jan. 18, 2001]

Related Code Sections


1926.755(b) Steel Erection, Repair, Replacement or Field Modification of Anchor Rods (Anchor Bolts)
Anchor rods (anchor bolts) shall not be repaired, replaced or field-modified without the approval of the project structural engineer of record ...
OSHA 1926 Construction > R Steel Erection > 1926.755 Column Anchorage > 1926.755(b) Repair, Replacement or Field Modification of Anchor Rods (Anchor Bolts)
1926.752(a)(2) Steel Erection,
Any repairs, replacements and modifications to the anchor bolts were conducted in accordance with ยง 1926.755(b) ...
OSHA 1926 Construction > R Steel Erection > 1926.752 Site Layout, Site-Specific Erection Plan and Construction Sequence > 1926.752(a) Approval to Begin Steel Erection > 1926.752(a)(2)
1926.758(b) Steel Erection,
Each structural column shall be anchored by a minimum of four anchor rods (anchor bolts) ...
OSHA 1926 Construction > R Steel Erection > 1926.758 Systems-Engineered Metal Buildings > 1926.758(b)
1926.755(a) Steel Erection, General Requirements for Erection Stability
All columns shall be anchored by a minimum of 4 anchor rods (anchor bolts ...
OSHA 1926 Construction > R Steel Erection > 1926.755 Column Anchorage > 1926.755(a) General Requirements for Erection Stability
1926.758 Steel Erection, Systems-Engineered Metal Buildings
shall be anchored by a minimum of four anchor rods (anchor bolts ...
OSHA 1926 Construction > R Steel Erection > 1926.758 Systems-Engineered Metal Buildings
Help Contact Us Privacy Terms
Code Compare
Code Compare
Highlight differences between any two building codes.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING