• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1007.1.3 Remoteness of Exit Access Stairways or Ramps

Building Code 2018 of Illinois > 10 Means of Egress > 1007 Exit and Exit Access Doorway Configuration > 1007.1 General > 1007.1.3 Remoteness of Exit Access Stairways or Ramps
JUMP TO FULL CODE CHAPTER
Where two exit access stairways or ramps provide the required means of egress to exits at another story, the required separation distance shall be maintained for all portions of such exit access stairways or ramps.

1007.1.3.1 Three or More Exit Access Stairways or Ramps

Where more than two exit access stairways or ramps provide the required means of egress, not less than two shall be arranged in accordance with Section 1007.1.3.

Related Code Sections


1007.1.3 Means of Egress, Remoteness of Exit Access Stairways or Ramps
Where two exit access stairways or ramps provide the required means of egress to exits at another story , the required separation distance ...
Building Code 2018 of Illinois > 10 Means of Egress > 1007 Exit and Exit Access Doorway Configuration > 1007.1 General > 1007.1.3 Remoteness of Exit Access Stairways or Ramps
1017.3 Means of Egress, Measurement
to be measured to the closest riser of an exit access stairway or the closest slope of an exit access ramp ...
Building Code 2018 of Illinois > 10 Means of Egress > 1017 Exit Access Travel Distance > 1017.3 Measurement
415.5.2 Special Detailed Requirements Based on Occupancy and Use, Dispensing, Use and Handling
Where hazardous materials having a hazard ranking of 3 or 4 in accordance with NFPA 704 are transported through corridors, interior exit stairways ...
Building Code 2018 of Illinois > 4 Special Detailed Requirements Based on Occupancy and Use > 415 Groups H-1, H-2, H-3, H-4 and H-5 > 415.5 Emergency Alarms > 415.5.2 Dispensing, Use and Handling
410.5.2 Special Detailed Requirements Based on Occupancy and Use, Stairway and Ramp Enclosure
Exit access stairways and ramps serving a stage or platform are not required to be enclosed. Exit access stairways and ramps serving ...
Building Code 2018 of Illinois > 4 Special Detailed Requirements Based on Occupancy and Use > 410 Stages, Platforms and Technical Production Areas > 410.5 Means of Egress > 410.5.2 Stairway and Ramp Enclosure
Section 1019 Means of Egress, Exit Access Stairways and Ramps
Exit access stairways and ramps serving as an exit access component in a means of egress system shall comply with the requirements ...
Building Code 2018 of Illinois > 10 Means of Egress > 1019 Exit Access Stairways and Ramps
Help Contact Us Privacy Terms
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Compare
Code Compare
Highlight differences between any two building codes.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE