// CODE SNIPPET
[A] 109.5 Related Fees
JUMP TO FULL CODE CHAPTER
The payment of the fee for the construction, alteration, removal or demolition for work done in connection to or concurrently with the work authorized by a building permit shall not relieve the applicant or holder of the permit from the payment of other fees that are prescribed by law.
Related Code Sections
108.5 Scope and Administration, Related Fees
The payment of the fee for the construction, alteration , removal, or demolition of work done in connection to or concurrently with the work ...
Existing Building Code 2018 of Illinois > 1 Scope and Administration > 108 Fees > 108.5 Related Fees
108.5 Scope and Administration, Related Fees
The payment of the fee for the construction, alteration , removal or demolition of work done in connection to or concurrently with the work ...
Existing Building Code 2021 of Illinois > 1 Scope and Administration > 108 Fees > 108.5 Related Fees
109.5 Scope and Administration, Related Fees
The payment of the fee for the construction, alteration , removal or demolition for work done in connection to or concurrently with the work ...
109.5 Scope and Administration, Related Fees
The payment of the fee for the construction, alteration , removal or demolition for work done in connection to or concurrently with the work ...
C104.4 [CE] Scope and Administration, Related Fees
The payment of the fee for the construction, alteration , removal or demolition of work done in connection to or concurrently with the work ...
2018 Illinois Energy Conservation Code Standards for Privately Funded Commercial Facilities and Standards for Residential Buildings > 1 [CE] Scope and Administration > C104 Fees > C104.4 Related Fees