• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

**§28-103.30 Real Time Enforcement Unit

NYC General Admin. Provisions 2014 > 1 Administration > 103 Duties and Powers of Commissioner of Buildings > **§28-103.30 Real Time Enforcement Unit
JUMP TO FULL CODE CHAPTER
There is hereby established within the department a real time enforcement unit. Such unit and an agency that is delegated authority by the commissioner shall be responsible for enforcing the construction codes with respect to:
  1. occupied multiple dwellings with complaints related to work without a permit; and
  2. occupied multiple dwellings with valid permits for (i) the alteration of 10 percent or more of the existing floor surface area of the building or (ii) an addition to the building.
**Section 28-103.30 was added by Local Law 188 of 2017. This law has an effective date of February 13, 2018 and was renumbered by Local Law 233 of 2017. This law has an effective date of December 1, 2018.

**§28-103.30.1 Tracking Complaints Related to Work Without a Permit

The real time enforcement unit shall receive and track all complaints related to work without a permit in occupied multiple dwellings. The unit shall retain records of such complaints.

**Section 28-103.30.1 was added by Local Law 188 of 2017. This law has an effective date of February 13, 2018 and was renumbered by Local Law 233 of 2017. This law has an effective date of December 1, 2018.

**§28-103.30.2 Monitoring Occupied Multiple Dwellings With Permits for Alteration or Addition

The real time enforcement unit shall monitor all occupied multiple dwellings with valid permits for (i) the alteration of 10 percent or more of the existing floor surface area of the building or (ii) an addition to the building. Owners of such buildings shall notify the department in writing at least 72 hours prior to the commencement of any work pursuant to such permits.

**Section 28-103.30.2 was added by Local Law 188 of 2017. This law has an effective date of February 13, 2018 and was renumbered by Local Law 233 of 2017. This law has an effective date of December 1, 2018.

**§28-103.30.3 Inspections

For immediately hazardous complaints related to work without a permit in occupied multiple dwellings, the real time enforcement unit shall conduct inspections of such occupied multiple dwellings within 12 hours of the receipt of such complaints, except that complaints received after 8:00 p.m. shall be inspected by 10:00 a.m. on the following day. For all other complaints related to work without a permit in occupied multiple dwellings, such unit shall conduct inspections of such multiple dwelling within ten days of receipt of such complaints. The real time enforcement unit shall also conduct initial inspections of no fewer than five percent of occupied multiple dwellings with valid permits for alteration or addition as described in section 28-103.26.2, within 20 days of commencement of work for such alterations or additions and shall conduct periodic unannounced inspections thereafter until such work is complete. The unit shall be available to conduct inspections seven days a week, between the hours of 8:30 a.m. and 10:00 p.m.

**Section 28-103.30.3 was added by Local Law 188 of 2017. This law has an effective date of February 13, 2018 and was renumbered by Local Law 233 of 2017. This law has an effective date of December 1, 2018.

**§28-103.30.4 Violations

The real time enforcement unit shall issue notices of violation or stop work orders as necessary.

**Section 28-103.30.4 was added by Local Law 188 of 2017. This law has an effective date of February 13, 2018 and was renumbered by Local Law 233 of 2017. This law has an effective date of December 1, 2018.

**§28-103.30.5 Report

The department shall publish online an annual report with the following information related to the effectiveness of the real time enforcement unit: (i) the number of complaints received disaggregated by building; (ii) the average time taken to respond to complaints; (iii) the number of monitored occupied multiple dwellings with valid permits for alteration or addition as described in section 28-103.26.2; (iv) the number of initial and periodic inspections conducted disaggregated by building; and (v) the number and type of violations issued disaggregated by building.

**Section 28-103.30.5 was added by Local Law 188 of 2017. This law has an effective date of February 13, 2018 and was renumbered by Local Law 233 of 2017. This law has an effective date of December 1, 2018.

Related Code Sections


**§28-103.30 Administration, Real Time Enforcement Unit
There is hereby established within the department a real time enforcement unit. Such unit and an agency that is delegated authority ...
NYC General Admin. Provisions 2014 > 1 Administration > 103 Duties and Powers of Commissioner of Buildings > **§28-103.30 Real Time Enforcement Unit
Article 103 Administration, Duties and Powers of Commissioner of Buildings
There is hereby established within the department a real time enforcement unit. Such unit and an agency that is delegated authority ...
NYC General Admin. Provisions 2014 > 1 Administration > 103 Duties and Powers of Commissioner of Buildings
1108.2.7.2.2 Accessibility, Real-Time Messages
Where electronic signs are provided and have the capability to display real-time messages containing information that is the same, or substantially ...
NYC Building Code 2008 > 11 Accessibility > 1108 Special Occupancies > 1108.2 Assembly Area Seating > 1108.2.7 Assistive Listening Systems > 1108.2.7.2 Public Address Systems > 1108.2.7.2.2 Real-Time Messages
1108.2.7.2.2 Accessibility, Real-Time Messages
Where electronic signs are provided and have the capability to display real-time messages containing information that is the same, or substantially ...
NYC Building Code 2014 > 11 Accessibility > 1108 Special Occupancies > 1108.2 Assembly Area Seating > 1108.2.7 Assistive Listening Systems > 1108.2.7.2 Public Address Systems > 1108.2.7.2.2 Real-Time Messages
§28-205.1.2 Enforcement, Presumptive Evidence
In any action or proceeding founded upon a claim by the commissioner that any law or rule enforceable by the department has been violated ...
NYC General Admin. Provisions 2008 > 2 Enforcement > 205 Civil Judicial Proceedings > §28-205.1 Civil Judicial Enforcement > §28-205.1.2 Presumptive Evidence
Help Contact Us Privacy Terms
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Compare
Code Compare
Highlight differences between any two building codes.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE