// CODE SNIPPET
1704.24.1.5 Readiness
JUMP TO FULL CODE CHAPTER
No standpipe system shall be considered in readiness until there has been a successful hydrostatic pressure test.
Related Code Sections
1704.22.1.5 Structural Tests and Special Inspections, Readiness
No standpipe system shall be considered in readiness until there has been a successful hydrostatic test. *Section BC 1704.22.1.5 was added by: Local ...
NYC Building Code 2008 > 17 Structural Tests and Special Inspections > 1704 Special Inspections > 1704.22 Standpipe System Special Inspection > 1704.22.1 Hydrostatic Pressure Testing > 1704.22.1.5 Readiness
1704.24.1.5 Structural Tests and Special Inspections, Readiness
No standpipe system shall be considered in readiness until there has been a successful hydrostatic pressure test ...
NYC Building Code 2014 > 17 Structural Tests and Special Inspections > 1704 Special Inspections > 1704.24 Standpipe System Special Inspection > 1704.24.1 Hydrostatic Pressure Testing > 1704.24.1.5 Readiness
3003.3 Elevators and Conveying Systems, Elevator in Readiness
Requirements for elevator in readiness shall be as defined in Sections 3003.3.1 through 3003.3.2 ...
NYC Building Code 2008 > 30 Elevators and Conveying Systems > 3003 Elevator Emergency Operations > 3003.3 Elevator in Readiness
3003.3 Elevators and Conveying Systems, Elevator in Readiness
Requirements for elevator in readiness shall be as defined in Sections 3003.3.1 through 3003.3.2 ...
NYC Building Code 2014 > 30 Elevators and Conveying Systems > 3003 Elevator Emergency Operations > 3003.3 Elevator in Readiness
§27-989 Elevators and Conveyors, Elevator in Readiness
(a) Except as provided in subdivision (b) of this section, in every building seventy-five feet or more in height, all floors shall be served ...