UpCodes logo
Go To Full Code Chapter
In addition to the requirements of Section 2002, the quality control of aluminum used for structural purposes shall comply with Sections 2003.2.1 and 2003.2.2.
2003.2.1 Reference
Welding operations shall be subjected to the special inspections as required by Chapter 17 of this code.
2003.2.2 Welding Operations
Welding operations performed on aluminum used for structural purposes shall comply with the following:
  1. The provisions of AWS D1.2.
  2. Welding work shall be performed only by persons who have obtained a license from the commissioner. Where manual welding work on structural members is not performed in the City of New York, welds shall be made by welders certified by the American Welding Society in accordance with AWS D1.2.
Upcodes Diagrams

Related Code Sections

2003.2 Aluminum, Quality Control
In addition to the requirements of Section 2002, the quality control of aluminum used for structural purposes shall comply with Sections 2003.2.1 ...
2003.2 Aluminum, Quality Control
In addition to the requirements of Section 2002, the quality control of aluminum used for structural purposes shall comply with Sections 2003.2.1 ...
2003.2 Aluminum, Quality Control
In addition to the requirements of Section 2002, the quality control of aluminum used for structural purposes shall comply with Sections 2003.2.1 ...
§27-616 Structural Work, Quality Control
(a) Reference. The provisions of tables 10-1 and 10-2 shall apply. (b) Welding operations. (1) Welding work shall be performed only by persons who ...
§27-620 Structural Work, Quality Control
Inspection of the fabrication of glued-laminated assemblies, as stipulated in table 10-2, shall include a check of sizes of members, of fit ...