// CODE SNIPPET
98-31 Purposes
JUMP TO FULL CODE CHAPTER
The High Line Transfer Corridor, established within the Special West Chelsea District, is intended to enable the transfer of development rights from properties over which and immediately to the west of where the High Line passes and thereby permit light and air to penetrate to the High Line and preserve and create view corridors from the High Line bed.
Related Code Sections
G101.1 Flood-Resistant Construction, Purpose
The purpose of this appendix is to promote the public health, safety and general welfare and to minimize public and private losses due to flood ...
NYC Building Code 2014 > G Flood-Resistant Construction > G101 Purpose and Objectives > G101.1 Purpose
§27-102 Administration and Enforcement, Purpose
The purpose of this code is to provide reasonable minimum requirements and standards, based upon current scientific and engineering knowledge ...
513.1 Exhaust Systems, Scope and Purpose
This section applies to mechanical and passive smoke control systems that are required by the New York City Building Code. The purpose ...
513.1 Exhaust Systems, Scope and Purpose
This section applies to mechanical and passive smoke control systems that are required by the New York City Building Code . The purpose ...
909.1 Fire Protection Systems, Scope and Purpose
This section applies to mechanical or passive smoke control systems when they are required by other provisions of this code. The purpose ...
NYC Building Code 2008 > 9 Fire Protection Systems > 909 Smoke Control Systems > 909.1 Scope and Purpose