• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1910.307(g)(3)(ii) Purged and Pressurized

OSHA 1910 General Industry > S Electrical > 1910.307 Hazardous (Classified) Locations > 1910.307(g) Class I, Zone 0, 1, and 2 Locations > 1910.307(g)(3) Protection Techniques > 1910.307(g)(3)(ii) Purged and Pressurized
JUMP TO FULL CODE CHAPTER
This protection technique is permitted for equipment in the Class I, Zone 1 or Zone 2 locations for which it is approved.

Related Code Sections


1910.307(f)(4) Electrical, Purged and Pressurized
This protection technique is permitted for equipment in any hazardous (classified) location for which it is approved ...
OSHA 1910 General Industry > S Electrical > 1910.307 Hazardous (Classified) Locations > 1910.307(f) Protection Techniques > 1910.307(f)(4) Purged and Pressurized
1910.253(d)(5)(i) Welding, Cutting, and Brazing,
Piping systems shall be tested and proved gastight at 1 1 / 2 times the maximum operating pressure, and shall be thoroughly purged of air before ...
OSHA 1910 General Industry > Q Welding, Cutting, and Brazing > 1910.253 Oxygen-Fuel Gas Welding and Cutting > 1910.253(d) Service Piping Systems > 1910.253(d)(5) Testing > 1910.253(d)(5)(i)
Subpart S Electrical, App A - Reference Documents
for Purged and Pressurized Enclosures for Electrical Equipment. NFPA 497-2004 Recommended Practice for the Classification of Flammable Liquids ...
OSHA 1910 General Industry > S Electrical > S App A - Reference Documents
1910.269(v)(10) Special Industries, Turbine Generators
shall be available to purge the hydrogen from the largest generator ...
OSHA 1910 General Industry > R Special Industries > 1910.269 Electric Power Generation, Transmission, and Distribution > 1910.269(v) Power Generation > 1910.269(v)(10) Turbine Generators
1910.252(a)(3)(ii) Welding, Cutting, and Brazing, Venting and Purging
All hollow spaces, cavities or containers shall be vented to permit the escape of air or gases before preheating, cutting or welding. Purging ...
OSHA 1910 General Industry > Q Welding, Cutting, and Brazing > 1910.252 General Requirements > 1910.252(a) Fire Prevention and Protection > 1910.252(a)(3) Welding or Cutting Containers > 1910.252(a)(3)(ii) Venting and Purging
Help Contact Us Privacy Terms
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE