• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

2206.7.2.2 Pump Sumps

NYC Fire Code 2014 > 22 Motor Fuel-Dispensing Facilities and Repair Garages > 2206 Design and Installation Requirements for Liquid Motor Fuel-Dispensing Facilities > 2206.7 Fuel-Dispensing Systems for Liquid Motor Fuel > 2206.7.2 Fixed Pumps Required > 2206.7.2.2 Pump Sumps
JUMP TO FULL CODE CHAPTER
Pump sumps shall be compatible with the liquid motor fuel, liquid-tight, and accessible for inspection. Prefabricated pump sumps shall be approved.

Related Code Sections


Section 1113 Storm Drainage, Sumps and Pumping Systems
The sump pump, pit and discharge piping shall conform to Sections 1113.1.1 through 1113.1.4 ...
NYC Plumbing Code 2008 > 11 Storm Drainage > 1113 Sumps and Pumping Systems
Section 1113 Storm Drainage, Sumps and Pumping Systems
The sump pump, pit and discharge piping shall conform to Sections 1113.1.1 through 1113.1.4 ...
NYC Plumbing Code 2014 > 11 Storm Drainage > 1113 Sumps and Pumping Systems
1113.1.2 Storm Drainage, Sump Pit
The sump pit shall not be less than 18 inches (457 mm) in diameter and 24 inches (610 mm) deep, unless otherwise approved. The pit shall ...
NYC Plumbing Code 2014 > 11 Storm Drainage > 1113 Sumps and Pumping Systems > 1113.1 Pumping System > 1113.1.2 Sump Pit
3004.4 Elevators and Conveying Systems, Plumbing and Mechanical Systems
Plumbing and mechanical systems shall not be located in an elevator shaft. Exception: Floor drains sumps and sump pumps shall be permitted ...
NYC Building Code 2014 > 30 Elevators and Conveying Systems > 3004 Hoistway Venting > 3004.4 Plumbing and Mechanical Systems
3004.5 Elevators and Conveying Systems, Plumbing and Mechanical Systems
Plumbing and mechanical systems shall not be located in an elevator shaft. Exception: Floor drains sumps and sump pumps shall be permitted ...
NYC Building Code 2008 > 30 Elevators and Conveying Systems > 3004 Hoistway Venting > 3004.5 Plumbing and Mechanical Systems
Help Contact Us Privacy Terms
Code Compare
Code Compare
Highlight differences between any two building codes.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE