2104.3.3.3 Protection Requirements for Temperatures Between 40°F (4°C) and 25°F (-4°C)
JUMP TO FULL CODE CHAPTER
When the temperature is between 40°F (4°C) and 25°F (-4°C), newly constructed masonry shall be covered with a weather-resistive membrane for 24 hours after being completed.
Related Code Sections
2104.3.3.3 Masonry, Protection Requirements for Temperatures Between 40°F (4°C) and 25°F (-4°C)
When the temperature is between 40°F (4°C) and 25°F (-4°C), newly constructed masonry shall be covered with a weather-resistive membrane for 24 hours ...
2010 Building Code of NY > 21 Masonry > 2104 Construction > 2104.3 Cold Weather Construction > 2104.3.3 Protection > 2104.3.3.3 Protection Requirements for Temperatures Between 40°F (4°C) and 25°F (-4°C)
2104.3.2.3 Masonry, Construction Requirements for Temperatures Between 25°F (-4°C) and 20°F (-7°C)
is between 25°F (-4°C) and 20°F (-7°C): Masonry surfaces under construction shall be heated to 40°F (4°C). Wind breaks or enclosures shall be provided when ...
2010 Building Code of NY > 21 Masonry > 2104 Construction > 2104.3 Cold Weather Construction > 2104.3.2 Construction > 2104.3.2.3 Construction Requirements for Temperatures Between 25°F (-4°C) and 20°F (-7°C)
2104.3.2.1 Masonry, Construction Requirements for Temperatures Between 40°F (4°C) and 32°F (0°C)
The following construction requirements shall be met when the ambient temperature is between 40°F (4°C) and 32°F (0°C): Glass unit masonry shall ...
2010 Building Code of NY > 21 Masonry > 2104 Construction > 2104.3 Cold Weather Construction > 2104.3.2 Construction > 2104.3.2.1 Construction Requirements for Temperatures Between 40°F (4°C) and 32°F (0°C)
Section E3705 Branch Circuit and Feeder Requirements, Conductor Sizing and Overcurrent Protection
a
30
35
40
25
30
35
10 a
8
40
50
55
35
40
45
8
6
55
65
75
40
50
55
6
4
70
85
95
55 ...
Residential Code 2015 of New York State > 37 Branch Circuit and Feeder Requirements > E3705 Conductor Sizing and Overcurrent Protection
2104.3.3.4 Masonry, Protection Requirements for Temperatures Between 25°F (-4°C) and 20°F (-7°C)
When the temperature is between 25°F (-4°C) and 20°F (-7°C), newly constructed masonry shall be completely covered with weather-resistive insulating ...
2010 Building Code of NY > 21 Masonry > 2104 Construction > 2104.3 Cold Weather Construction > 2104.3.3 Protection > 2104.3.3.4 Protection Requirements for Temperatures Between 25°F (-4°C) and 20°F (-7°C)