• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

Article 8 Procedures for Connections

California Administrative Code 2019 > 6 Seismic Evaluation Procedures for Hospital Buildings > 8 Procedures for Connections
JUMP TO FULL CODE CHAPTER

8.0 Introduction

The connections evaluated in this article are connections between:

  • Framing members and walls;
  • Diaphragms and walls or frames; and
  • Walls or frames and foundations.

Connections between other structural members are discussed in the appropriate article.

8.1 Connection Concerns

The evaluation of these specific connections involves review of:

  • Lateral support of walls that are perpendicular to the direction of the earthquake ("normal walls");
  • Transfer of shear from diaphragms to shear walls and frames that are parallel to the direction of the earthquake;
  • Anchorage of walls and columns to the foundations; and
  • Interconnection of elements where failure of connections would jeopardize the system.

8.2 Anchorage for Normal Forces

8.2.1 Wood Ledgers

The connection between the wall panels and the diaphragm does not induce cross-grain bending or tension in the wood ledgers.

For conforming buildings, the evaluator may consider this condition as mitigated, and no calculations are necessary. The deficiency is in the strength of the wall-to-diaphragm connection. Report this condition as a deficiency.

8.2.2 Wall Anchorage

Exterior concrete or masonry walls are anchored to each of the diaphragm levels for out-of-plane loads.

For conforming buildings, the evaluator may consider this condition as mitigated, and no calculations are necessary. The deficiency is in the strength of the wall-to-diaphragm connections. Check that the anchor provides a direct, positive connection between the wall and the diaphragm for forces perpendicular to the face of the wall. Evaluate the wall anchorage, treating the wall as a portion of the building, with Fp as the demand.

8.2.3 Masonry Wall Anchors

Wall anchorage connections are steel anchors or straps that are developed into the diaphragm.

For conforming buildings, the evaluator may consider this condition as mitigated, and no calculations are necessary. The deficiency is in the strength of the wall anchors. Evaluate the wall anchorage, treating the wall as a portion of the building, with Fp as the demand.

8.2.4 Anchor Spacing

The anchors from the floor and roof systems into exterior masonry walls are spaced at 4 feet or less.

For conforming buildings, the evaluator may consider this condition as mitigated, and no calculations are necessary. The deficiency is in the strength or the number of the anchors. Evaluate the wall anchors, treating the wall as a portion of the building, with Fp as the demand.

8.2.5 Tilt-Up Walls

Precast bearing walls are connected to the diaphragms for out-of-plane loads; steel anchors or straps are embedded in the walls and developed into the diaphragm.

For conforming buildings, the evaluator may consider this condition as mitigated, and no calculations are necessary. The deficiency is in the strength of the wall anchors. Evaluate the wall anchorage, treating the load as a portion of the building, with Fp as the demand. Check the load path between the wall anchors and the diaphragm cross tie.

8.2.6 Panel-Diaphragm Connections

There are at least two anchors from each precast wall panel into the diaphragm elements.

For conforming buildings, the evaluator may consider this condition as mitigated, and no calculations are necessary. The deficiency is in the number of anchors. Report this condition as a deficiency.

8.2.7 Inadequate Stiffness of Wall Anchors

Anchors of walls to wood structural elements are installed taut and are stiff enough to prevent movement between the wall and roof.

The deficiency is in the ability of the wall anchor to prevent separations between the wall and roof sheathing that may result in out-of-plane failure of the ledger support. Inspect all anchors to see that they do not have twists, kinks, offsets, or are otherwise installed so that some movement is required before the anchor becomes effective, and that this condition may lead to cross grain bending in the ledger. Conforming buildings which fail this check shall be placed in SPC 4.

8.3 Shear Transfer

8.3.1 Transfer to Shear Walls

Diaphragms have sufficient capacity and are connected for transfer of loads to the shear walls.

For conforming buildings, the evaluator may consider this condition as mitigated, and no calculations are necessary. The deficiency is in the capacity of the connection to transfer shear. Verify the adequacy of the available diaphragm capacity.

8.3.2 Transfer to Steel Frames

The method used to transfer diaphragm shears to the steel frames is approved for use under lateral loads.

For conforming buildings, the evaluator may consider this condition as mitigated, and no calculations are necessary. The deficiency is in the capacity of the connection to transfer shear. Evaluate the capacity of the load-transfer mechanism provided, using AISC design methods or approved manufacturer's data. Compare this capacity to the assumed lateral force distribution.

8.3.3 Topping Slab to Walls and Frames

Reinforced concrete topping slabs that interconnect the precast concrete diaphragm elements are doweled into the shear wall or frame elements.

For conforming buildings, the evaluator may consider this condition as mitigated, and no calculations are necessary. The deficiency is in the capacity of the connection to transfer shear. Evaluate the capacity of the load-transfer mechanism provided. Compare this capacity to the assumed lateral force distribution.

8.4 Vertical Components to Foundations

8.4.1 Steel Columns

The columns in lateral-force-resisting frames are substantially anchored to the building foundation.

For conforming buildings, the evaluator may consider this condition as mitigated, and no calculations are necessary. The deficiency is in the strength of the connection between the frame and the foundation. Report this condition as a deficiency.

8.4.2 Concrete Columns

All longitudinal column steel is doweled into the foundation.

For conforming buildings, the evaluator may consider this condition as mitigated, and no calculations are necessary. The deficiency is in the strength of the connection between the column and the foundation. Report this condition as a deficiency.

8.4.3 Wood Posts

There is positive connection of wood posts to the foundation and the elements being supported.

For conforming buildings, the evaluator may consider this condition as mitigated, and no calculations are necessary. The deficiency is in the strength of the connection between the post and the foundation. Report this condition as a deficiency.

8.4.4 Wall Reinforcing

All vertical wall reinforcing is doweled into the foundation.

For conforming buildings, the evaluator may consider this condition as mitigated, and no calculations are necessary. The deficiency is in the strength of the connection between the wall and the foundation. Report this condition as a deficiency.

8.4.5 Shear-Wall-Boundary Columns

The shear-wall columns are substantially anchored to the building foundation.

For conforming buildings, the evaluator may consider this condition as mitigated, and no calculations are necessary. The deficiency is in the strength of the connection between the shear-wall columns and the foundation. Report this condition as a deficiency.

8.4.6 Wall Panels

The wall panels are connected to the foundation and/or ground floor slab with dowels equal to the vertical panel reinforcing.

For conforming buildings, the evaluator may consider this condition as mitigated, and no calculations are necessary. The deficiency is in the strength of the connection between the wall panel and the foundation. Report this condition as a deficiency.

8.4.7 Wood Sills

All wall elements are bolted to the foundation sill at 6-foot spacing or less with proper edge and end distances for concrete and wood.

For conforming buildings, the evaluator may consider this condition as mitigated, and no calculations are necessary. The deficiency is in the strength of the connection between the wood sill and the foundation. Report this condition as a deficiency.

8.5 Interconnection of Elements

8.5.1 Girders

Girders supported by walls or pilasters have special ties to secure the anchor bolts.

The deficiency is in the strength of the pilaster at the girder anchorage. Report this condition as a deficiency. Conforming buildings that fail this check shall be placed in SPC 4.

8.5.2 Corbel Bearing

If the frame girders bear on column corbels, the length of bearing is greater than 3 inches.

The deficiency is in the length of bearing. Calculate the inter-story drift. Judge the adequacy of the connections to retain their vertical load-carrying integrity at a maximum drift estimated to be equal to the drift calculated with the unreduced demand. Conforming buildings that fail this check shall be placed in SPC 4.

8.5.3 Corbel Connections

The frame girders are not supported on corbels with welded elements.

The deficiency is in the strength of the connection. Check all welded connections that transfer lateral loads or are subject to frame action. Determine where connection failures would be brittle (e.g., pull-out of embedded item would occur before yield of mild steel element). Analyze structure for capacity without such connections or check such connections for seismic force amplified by factor Cd/2, but not less than 1.5. For connections that can allow the diaphragm to fail in a brittle manner, the R values used in computing the seismic demand shall be consistent with those for brittle systems (not to exceed R = 2). Conforming buildings that fail this check shall be placed in SPC 4.

8.6 Roof Decking

8.6.1 Light-Gage Metal, Plastic or Cementitious Roof Panels

All light-gage metal, plastic or cementitious roof panels are properly connected to the roof framing at not more than 12 inches on center.

For conforming buildings, the evaluator may consider this condition as mitigated, and no calculations are necessary. The deficiency is the lack of connection of sufficient strength between the roof panels and the framing elements. Report this condition as a deficiency.

8.6.2 Wall Panels

All wall panels (metal, fiberglass or cementitious) are properly connected to the framing.

For conforming buildings, the evaluator may consider this condition as mitigated, and no calculations are necessary. The deficiency is the lack of connections of sufficient strength (to prevent a falling hazard) and flexibility (to allow for the relative displacements between the panel and the supporting frame). Report this condition as a deficiency.

Related Code Sections


Article 8 Seismic Evaluation Procedures for Hospital Buildings, Procedures for Connections
The connections evaluated in this article are connections between: Framing members and walls; Diaphragms and walls or frames; and Walls or frames ...
California Administrative Code 2019 > 6 Seismic Evaluation Procedures for Hospital Buildings > 8 Procedures for Connections
Article 8 Seismic Evaluation Procedures for Hospital Buildings, Procedures for Connections
The connections evaluated in this article are connections between: Framing members and walls; Diaphragms and walls or frames; and Walls ...
California Administrative Code 2016 > 6 Seismic Evaluation Procedures for Hospital Buildings > 8 Procedures for Connections
8.4 Seismic Evaluation Procedures for Hospital Buildings, Vertical Components to Foundations
consider this condition as mitigated, and no calculations are necessary. The deficiency is in the strength of the connection between the frame ...
California Administrative Code 2016 > 6 Seismic Evaluation Procedures for Hospital Buildings > 8 Procedures for Connections > 8.4 Vertical Components to Foundations
8.5 Seismic Evaluation Procedures for Hospital Buildings, Interconnection of Elements
than 3 inches. The deficiency is in the length of bearing. Calculate the inter-story drift. Judge the adequacy of the connections to retain ...
California Administrative Code 2019 > 6 Seismic Evaluation Procedures for Hospital Buildings > 8 Procedures for Connections > 8.5 Interconnection of Elements
8.5 Seismic Evaluation Procedures for Hospital Buildings, Interconnection of Elements
than 3 inches. The deficiency is in the length of bearing. Calculate the inter-story drift. Judge the adequacy of the connections to retain ...
California Administrative Code 2016 > 6 Seismic Evaluation Procedures for Hospital Buildings > 8 Procedures for Connections > 8.5 Interconnection of Elements
Help Contact Us Privacy Terms
Code Compare
Code Compare
Highlight differences between any two building codes.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE