• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

3305.3.5.3 Prestressed Members

NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3305 Material Placement and Installation > 3305.3 Concrete Formwork > 3305.3.5 Removal of Forms and Shoring > 3305.3.5.3 Prestressed Members
JUMP TO FULL CODE CHAPTER
Form supports for prestressed concrete members shall not be removed until sufficient prestressing has been applied to prestressed members to carry their dead load and anticipated construction loads.

Related Code Sections


1906.5.3 Concrete, Prestressed Members
Form supports for prestressed concrete members shall not be removed until sufficient prestressing has been applied to prestressed members to carry ...
NYC Building Code 2008 > 19 Concrete > 1906 Formwork, Embedded Pipes and Construction Joints > 1906.5 Removal of Forms and Shoring > 1906.5.3 Prestressed Members
3305.3.5.3 Safeguards During Construction or Demolition, Prestressed Members
Form supports for prestressed concrete members shall not be removed until sufficient prestressing has been applied to prestressed members to carry ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3305 Material Placement and Installation > 3305.3 Concrete Formwork > 3305.3.5 Removal of Forms and Shoring > 3305.3.5.3 Prestressed Members
106.7.6 Administration, Pre-Stressing Forces
Where prestressed members are employed, a schedule or table shall show the total prestressing forces and the method and sequence of application ...
NYC Building Code 2008 > 1 Administration > 106 Construction Documents > 106.7 Structural Plans > 106.7.6 Pre-Stressing Forces
1908.1.3 Concrete, ACI 318, Section 21
in flexural members of frames, provided the average prestress, f pc , calculated for an area equal to the member's shortest cross-sectional dimension ...
NYC Building Code 2008 > 19 Concrete > 1908 Modifications to ACI 318 > 1908.1 General > 1908.1.3 ACI 318, Section 21
107.7.6 Administration, Prestressing Forces
Where pre-stressed members are employed, a schedule or table shall show the total prestressing forces and the method and sequence of application ...
NYC Building Code 2014 > 1 Administration > 107 Construction Documents > 107.7 Structural Plans > 107.7.6 Prestressing Forces
Help Contact Us Privacy Terms
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE