(B) Pressurization "p"
Go To Full Code Chapter
This protection technique shall be permitted for equipment in those Class I, Zone 1 or Zone 2 locations for which it is identified.
Related Code Sections
(B) Special Occupancies, Pressurization "p"
This protection technique shall be permitted for equipment in those Class I, Zone 1 or Zone 2 locations for which it is identified ...
8.2.8.1.3 General Requirements, Plungers Subjected to External Pressure
Units) where D = external finished diameter, mm (in.) p = working pressure, kPa (psi) t = finished wall thickness, mm (in.) ...
8.2.8.1.3 General Requirements, Plungers Subjected to External Pressure
Units) where D = external finished diameter, mm (in.) p = working pressure, kPa (psi) t = finished wall thickness ...
503.2.7.1.3 Commercial Energy Efficiency, High-Pressure Duct Systems
in cfm per 100 square feet of duct surface. P = The static pressure of the test. Documentation shall be furnished by the designer demonstrating ...
C403.2.9.1.3 [CE] Commercial Energy Efficiency, High-Pressure Duct Systems
measured leakage rate in cfm per 100 square feet of duct surface.
P
=
The static pressure of the test.
Documentation shall ...
New York State Energy Conservation Construction Code (NYSECCC) > 4 [CE] Commercial Energy Efficiency > C403 Building Mechanical Systems > C403.2 Provisions Applicable to All Mechanical Systems (Mandatory) > C403.2.9 Duct and Plenum Insulation and Sealing > C403.2.9.1 Duct Construction > C403.2.9.1.3 High-Pressure Duct Systems