1.4.1 Preparation of the Compliance Plan
JUMP TO FULL CODE CHAPTER
The Compliance Plan shall be prepared and submitted in conformance with these regulations in the following format:
- Compliance Plans shall be submitted in an 81/2- by 11-inch format;
- All site, architectural, and engineering plans shall be formatted on 11- by 17-inch sheets (folded to 81/2 by 11 inches);
- Larger sheets, if required to clearly describe the requested information, shall be appended to the compliance plan; and
- Other supporting documents in addition to those meeting the minimum requirements of Section 1.4.4 may be appended to the compliance plan.
Related Code Sections
1.4.1 Seismic Evaluation Procedures for Hospital Buildings, Preparation of the Compliance Plan
The Compliance Plan shall be prepared and submitted in conformance with these regulations in the following format: Compliance Plans shall ...
California Administrative Code 2019 > 6 Seismic Evaluation Procedures for Hospital Buildings > 1 Definitions and Requirements > 1.4 Compliance Plans > 1.4.1 Preparation of the Compliance Plan
1.4.1 Seismic Evaluation Procedures for Hospital Buildings, Preparation of the Compliance Plan
The Compliance Plan shall be prepared and submitted in conformance with these regulations in the following format: Compliance Plans shall ...
California Administrative Code 2016 > 6 Seismic Evaluation Procedures for Hospital Buildings > 1 Definitions and Requirements > 1.4 Compliance Plans > 1.4.1 Preparation of the Compliance Plan
2810.3 Lumber Yards and Agro-Industrial, Solid Biomass and Woodworking Facilities, Fire Prevention Plan
The owner or owner's authorized representative shall prepare an approved fire prevention plan that includes all of the following: Frequency of walk ...
California Fire Code 2019 > 28 Lumber Yards and Agro-Industrial, Solid Biomass and Woodworking Facilities > 2810 Outdoor Storage of Pallets at Pallet Manufacturing and Recycling Facilities > 2810.3 Fire Prevention Plan
1.4.4.4 Seismic Evaluation Procedures for Hospital Buildings, Compliance Plan Schedule
Provide a bar graph schedule which describes the schedule for compliance with the SPC and NPC seismic performance categories, indicating the schedule ...
California Administrative Code 2016 > 6 Seismic Evaluation Procedures for Hospital Buildings > 1 Definitions and Requirements > 1.4 Compliance Plans > 1.4.4 Compliance Plan Requirements > 1.4.4.4 Compliance Plan Schedule
Section 2810 Lumber Yards and Agro-Industrial, Solid Biomass and Woodworking Facilities, Outdoor Storage of Pallets at Pallet Manufacturing and Recycling Facilities
The owner or owner's authorized representative shall prepare an approved fire prevention plan ...
California Fire Code 2019 > 28 Lumber Yards and Agro-Industrial, Solid Biomass and Woodworking Facilities > 2810 Outdoor Storage of Pallets at Pallet Manufacturing and Recycling Facilities