• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1224.34.6.3 Pre-Procedure/Recovery Accommodations

Los Angeles Building Code > 12 Interior Environment > 1224 [OSHPD 1] Hospitals > 1224.34 Nuclear Medicine > 1224.34.6 Radiosurgery Suite > 1224.34.6.3 Pre-Procedure/Recovery Accommodations
JUMP TO FULL CODE CHAPTER

If provided, pre-procedure/recovery patient care stations shall meet the following requirements:

  1. Pre-procedure and recovery area(s) shall be immediately accessible to procedure rooms and separate from corridors. The pre-procedure and recovery patient area or room shall be arranged to permit visual observation of the patient by staff before and after the procedure. Bays, cubicles, or single-bed rooms shall be permitted to serve as patient care stations.
  2. Area. Where open bays are used, each patient care station shall have a minimum clear floor area of 80 square feet (7.43 m2).
  3. Clearances. Each bay or cubicle shall have a minimum clearance of 3 feet (914 mm) between walls or partitions and the sides and foot of gurneys or patient beds. Each bay shall have a minimum clearance of 4 feet (1218 mm) between sides of gurneys or patient beds.
  4. Patient privacy. Provisions such as cubicle curtains shall be provided for patient privacy.
  5. Handwashing station. A handwashing station shall be provided within the pre-procedure/ recovery area.

Related Code Sections


1224.34.6.3 Interior Environment, Pre-Procedure/Recovery Accommodations
If provided, pre-procedure/recovery patient care stations shall meet the following requirements: Pre-procedure and recovery area(s) shall ...
Los Angeles Building Code > 12 Interior Environment > 1224 [OSHPD 1] Hospitals > 1224.34 Nuclear Medicine > 1224.34.6 Radiosurgery Suite > 1224.34.6.3 Pre-Procedure/Recovery Accommodations
1224.34.1.2 Interior Environment, Nuclear Medicine Room
materials are handled, prepared, or disposed of. Pre-procedure patient care and recovery area shall be provided to accommodate at least two stretchers ...
Los Angeles Building Code > 12 Interior Environment > 1224 [OSHPD 1] Hospitals > 1224.34 Nuclear Medicine > 1224.34.1 General > 1224.34.1.2 Nuclear Medicine Room
1224.28.4 Interior Environment, Interventional Imaging
Pre-procedure and recovery areas shall be immediately accessible to procedure rooms and separate from ...
Los Angeles Building Code > 12 Interior Environment > 1224 [OSHPD 1] Hospitals > 1224.28 Supplemental Surgery and Special Procedure Services > 1224.28.4 Interventional Imaging
1224.28 Interior Environment, Supplemental Surgery and Special Procedure Services
Pre-procedure and recovery areas shall be immediately accessible to procedure rooms and separate from corridors. The pre-procedure ...
Los Angeles Building Code > 12 Interior Environment > 1224 [OSHPD 1] Hospitals > 1224.28 Supplemental Surgery and Special Procedure Services
1224.34.1 Interior Environment, General
, or disposed of. Pre-procedure patient care and recovery area shall be provided to accommodate at least two stretchers. This area shall comply ...
Los Angeles Building Code > 12 Interior Environment > 1224 [OSHPD 1] Hospitals > 1224.34 Nuclear Medicine > 1224.34.1 General
Help Contact Us Privacy Terms
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Compare
Code Compare
Highlight differences between any two building codes.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE