A4.404.4 Pre-Cut Materials and Details
JUMP TO FULL CODE CHAPTER
Material lists are included in the plans which specify the material quantity and provide direction for on-site cuts to be made from the material provided. Material lists and direction shall be provided for the following systems:
- Floor framing.
- Wall framing.
- Ceiling and roof framing.
- Structural panels and roof sheathing.
Related Code Sections
A4.404.4 Residential Voluntary Measures, Pre-Cut Materials and Details
Material lists are included in the plans which specify the material quantity and provide direction for on-site cuts to be made from the material ...
Los Angeles Green Building Code > A4 Residential Voluntary Measures > A4.404 Efficient Framing Techniques > A4.404.4 Pre-Cut Materials and Details
A4.404.4 Residential Voluntary Measures, Pre-Cut Materials and Details
Material lists are included in the plans which specify the material quantity and provide direction for on-site cuts to be made from the material ...
Los Angeles Green Building Code > A4 Residential Voluntary Measures > A4.404 Efficient Framing Techniques > A4.404.4 Pre-Cut Materials and Details
5001.3.3.12 Hazardous Materials—General Provisions, Pre-Startup Safety Review
Written documentation of pre-startup safety review procedures shall be developed and enforced to ensure that operations are initiated in a safe ...
2017 LA City Fire Code > 50 Hazardous Materials—General Provisions > 5001 General > 5001.3 Performance-Based Design Alternative > 5001.3.3 Performance Requirements > 5001.3.3.12 Pre-Startup Safety Review
3504.3.1 Welding and Other Hot Work, Pre-Hot-Work Check
A pre-hot-work check shall be conducted prior to work to ensure that all equipment is safe and hazards are recognized and protected. A report ...
2017 LA City Fire Code > 35 Welding and Other Hot Work > 3504 Fire Safety Requirements > 3504.3 Area Reviews > 3504.3.1 Pre-Hot-Work Check
1810.3.1.5.1 Soils and Foundations, Helical Piles Seismic Requirements
1810.3.3 by at least two project specific pre-production tests for each soil profile, size and depth of helical pile. At least two percent of all ...
Los Angeles Building Code > 18 Soils and Foundations > 1810 Deep Foundations > 1810.3 Design and Detailing > 1810.3.1 Design Conditions > 1810.3.1.5 Helical Piles > 1810.3.1.5.1 Helical Piles Seismic Requirements