Where tubes are embedded in a structural concrete slab, such tubes shall not be larger in outside dimension than one-third of the overall thickness of the slab and shall be spaced not less than three diameters on center except within 10 feet (3048 mm) of the distribution manifold. The top of the tubing shall be embedded in the slab not less than 2 inches (51 mm) below the surface of the finished concrete slab.

Related Code Sections

1220.4.2 Hydronics, Poured Structural Concrete Slab Systems
Where tubes are embedded in a structural concrete slab, such tubes shall not be larger in outside dimension than one-third of the overall thickness ...
1217.5 Hydronics, Poured Floor Structural Concrete Slab Systems (Thermal Mass)
Where tubing is embedded in a structural concrete slab such tubes shall not be larger in outside dimension than one-third of the overall thickness ...
1615.3.1 Structural Design, Concrete Frame Structures
Frame structures constructed primarily of reinforced or prestressed concrete, either cast-in-place or precast, or a combination of these, shall ...
(3) Equipment for General Use, Installed in Poured Concrete
Thermal protection shall not be required in a recessed high-intensity discharge luminaire identified for use and installed in poured concrete ...