1217.6 Poured Floor Systems (Thermal Mass)
JUMP TO FULL CODE CHAPTER
Where tubing is embedded in a concrete slab such tubes shall not be
larger in outside dimension than one-third of the overall thickness
of the slab and shall be spaced not less than three diameters
on center. The top of the tubing shall be embedded in
the slab not less than 2 inches (51 mm) below the surface.
Where embedded in or installed under a concrete slab,
tubing shall be protected from damage at penetrations of
the slab with a protective pipe sleeve. The space between
the tubing and sleeve shall be sealed. The tubing at the
location of an expansion joint in a concrete slab shall be
encased in a protective pipe sleeve that covers the tubing
not less than 12 inches (305 mm) on either side of the
expansion joint or the tubing shall be installed below the
slab.
Where a poured concrete radiant
floor system is installed in contact with the soil, not less
than R-5 insulation shall be installed and shall be placed
between the soil and the concrete; extend to the outside
edges of the concrete; and be placed on all slab edges.
Where a poured concrete radiant floor system is installed on grade, not less than R-5 insulation shall be installed and placed on vertical slab edges.
Where a poured concrete radiant floor system is installed within a habitable space above and below, the total R-value of the floor system below the concrete slab shall be more than the total R-value of the material lying above the concrete slab and the floor system shall have not less than a R-3 value.
Where a poured concrete radiant floor system is installed on grade, not less than R-5 insulation shall be installed and placed on vertical slab edges.
Where a poured concrete radiant floor system is installed within a habitable space above and below, the total R-value of the floor system below the concrete slab shall be more than the total R-value of the material lying above the concrete slab and the floor system shall have not less than a R-3 value.
Where tubing is
installed below a subfloor, the tube spacing shall be in
accordance with the system design and joist space limitations.
Where tubing is installed above or in the subfloor, the tube spacing shall not exceed 12 inches (305 mm) center-to-center for living areas.
Where tubing is installed in the joist cavity, the cavity shall be insulated with not less than R-12 material.
An air space of not less than 2 inches (51 mm) shall be maintained between the top of the insulation and the underside of the floor unless a conductive plate is installed.
Where tubing is installed above or in the subfloor and not embedded in concrete, the floor assembly shall be insulated with not less than R-12 material below the tubing.
Where tubing is installed above or in the subfloor, the tube spacing shall not exceed 12 inches (305 mm) center-to-center for living areas.
Where tubing is installed in the joist cavity, the cavity shall be insulated with not less than R-12 material.
An air space of not less than 2 inches (51 mm) shall be maintained between the top of the insulation and the underside of the floor unless a conductive plate is installed.
Where tubing is installed above or in the subfloor and not embedded in concrete, the floor assembly shall be insulated with not less than R-12 material below the tubing.
Where piping is
installed in the wall stud cavity or the ceiling joist cavity,
the cavity shall be insulated with not less than R-12 material.
The insulation shall be installed in such a manner as
to prevent heating or cooling loss from the space intended
to be controlled.
An air space of not less than 2 inches (51 mm) shall be maintained between the insulation and the interior surface of the panel unless a conductive plate is installed.
An air space of not less than 2 inches (51 mm) shall be maintained between the insulation and the interior surface of the panel unless a conductive plate is installed.
Related Code Sections
1217.6 Hydronics, Poured Floor Systems (Thermal Mass)
Where a poured concrete radiant
floor system is installed in contact ...
Los Angeles Mechanical Code > 12 Hydronics > 1217.0 Radiant Heating and Cooling > 1217.6 Poured Floor Systems (Thermal Mass)
1217.5.3 Hydronics, Joist Systems and Subfloors
Where tubing
is installed below a subfloor, the tube spacing shall be
in accordance with the system design and joist space limitations ...
Los Angeles Mechanical Code > 12 Hydronics > 1217.0 Radiant Heating and Cooling > 1217.5 Poured Floor Structural Concrete Slab Systems (Thermal Mass) > 1217.5.3 Joist Systems and Subfloors
1217.5 Hydronics, Poured Floor Structural Concrete Slab Systems (Thermal Mass)
Where a poured concrete radiant
floor system is installed in contact ...
Los Angeles Mechanical Code > 12 Hydronics > 1217.0 Radiant Heating and Cooling > 1217.5 Poured Floor Structural Concrete Slab Systems (Thermal Mass)
1217.5.1 Hydronics, Slab Penetration Tube and Joint Protection
Where embedded in or installed under a concrete
slab, tubing shall be protected from damage at penetrations of the slab with protective sleeving ...
Los Angeles Mechanical Code > 12 Hydronics > 1217.0 Radiant Heating and Cooling > 1217.5 Poured Floor Structural Concrete Slab Systems (Thermal Mass) > 1217.5.1 Slab Penetration Tube and Joint Protection
1217.5.4 Hydronics, Wall and Ceiling Panels
Where piping is
installed in the stud wall cavity or the ceiling joist cavity,
the cavity shall be insulated with not less than R-12 material.
The ...