• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

**§28-103.33.4 Posting of Information

NYC General Admin. Provisions 2014 > 1 Administration > 103 Duties and Powers of Commissioner of Buildings > **§28-103.33 Office of Alternative Energy > **§28-103.33.4 Posting of Information
JUMP TO FULL CODE CHAPTER
The office of alternative energy shall maintain a website and shall post on such website the contact information for such office and a statement indicating that any person may contact such office if such person has a comment, question or complaint with respect to such office.

**Section 28-103.31.4 was added by Local Law 233 of 2017. This law has an effective date of December 1, 2018 and was renumbered by Local Law 93 of 2019. This law has an effective date of September 16, 2019.

*§28-103.33.4.1 Information Regarding Installation of Green Roof Systems

The office of alternative energy shall further post and maintain links on its website to information regarding the installation of green roof systems and other resources and materials regarding the installation of green roof systems and other resources and materials regarding green roof systems.

*Section 28-103.33.4.1 was added by Local Law 93 of 2019. This law has an effective date of September 16, 2019.

Related Code Sections


**§28-103.33.4 Administration, Posting of Information
The office of alternative energy shall maintain a website and shall post on such website the contact information for such office and a statement ...
NYC General Admin. Provisions 2014 > 1 Administration > 103 Duties and Powers of Commissioner of Buildings > **§28-103.33 Office of Alternative Energy > **§28-103.33.4 Posting of Information
3301.9.1.2 Safeguards During Construction or Demolition, Posting of Project Information Panels
A project information panel shall be posted on the fence on each perimeter fronting a public thoroughfare. Where such perimeter is more than 150 feet ...
NYC Building Code 2008 > 33 Safeguards During Construction or Demolition > 3301 General > 3301.9 Required Signs > 3301.9.1 Fence Project Information Panel > 3301.9.1.2 Posting of Project Information Panels
3301.9.1.2 Safeguards During Construction or Demolition, Posting of Project Information Panels
A project information panel shall be posted on the fence on each perimeter fronting a public thoroughfare. Where such perimeter is more than 150 feet ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3301 General > 3301.9 Required Signs > 3301.9.1 Fence Project Information Panel > 3301.9.1.2 Posting of Project Information Panels
*§28-104.2.8 Administration, Notification of Rejection
, disaggregated by community board. In addition, the department shall post such information on its website on a weekly basis. *Section 28-104.2.8 was amended ...
NYC General Admin. Provisions 2014 > 1 Administration > 104 Construction Documents > *§28-104.2 Application for Approval of Construction Documents > *§28-104.2.8 Notification of Rejection
Article 4 Mechanical Ventilation, Air Conditioning, and Refrigeration Systems, Posting
Information to be posted shall be as required in reference standard RS-13. Method of posting shall be as required in subchapter one of this chapter ...
NYC 1968 Code (Vol I) > 13 Mechanical Ventilation, Air Conditioning, and Refrigeration Systems > 4 Posting
Help Contact Us Privacy Terms
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Compare
Code Compare
Highlight differences between any two building codes.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE