// CODE SNIPPET
**§28-103.33.4 Posting of Information
JUMP TO FULL CODE CHAPTER
The office of alternative energy shall maintain a website and shall post on such website the contact information for such office and a statement indicating that any person may contact such office if such person has a comment, question or complaint with respect to such office.
**Section 28-103.31.4 was added by Local Law 233 of 2017. This law has an effective date of December 1, 2018 and was renumbered by Local Law 93 of 2019. This law has an effective date of September 16, 2019.
**Section 28-103.31.4 was added by Local Law 233 of 2017. This law has an effective date of December 1, 2018 and was renumbered by Local Law 93 of 2019. This law has an effective date of September 16, 2019.
The office of alternative energy shall further post and maintain links on its website to information regarding the installation of green roof systems and other resources and materials regarding the installation of green roof systems and other resources and materials regarding green roof systems.
*Section 28-103.33.4.1 was added by Local Law 93 of 2019. This law has an effective date of September 16, 2019.
*Section 28-103.33.4.1 was added by Local Law 93 of 2019. This law has an effective date of September 16, 2019.
Related Code Sections
**§28-103.33.4 Administration, Posting of Information
The office of alternative energy shall maintain a website and shall post on such website the contact information for such office and a statement ...
NYC General Admin. Provisions 2014 > 1 Administration > 103 Duties and Powers of Commissioner of Buildings > **§28-103.33 Office of Alternative Energy > **§28-103.33.4 Posting of Information
3301.9.1.2 Safeguards During Construction or Demolition, Posting of Project Information Panels
A project information panel shall be posted on the fence on each perimeter fronting a public thoroughfare. Where such perimeter is more than 150 feet ...
NYC Building Code 2008 > 33 Safeguards During Construction or Demolition > 3301 General > 3301.9 Required Signs > 3301.9.1 Fence Project Information Panel > 3301.9.1.2 Posting of Project Information Panels
3301.9.1.2 Safeguards During Construction or Demolition, Posting of Project Information Panels
A project information panel shall be posted on the fence on each perimeter fronting a public thoroughfare. Where such perimeter is more than 150 feet ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3301 General > 3301.9 Required Signs > 3301.9.1 Fence Project Information Panel > 3301.9.1.2 Posting of Project Information Panels
*§28-104.2.8 Administration, Notification of Rejection
, disaggregated by community board. In addition, the department shall post such information on its website on a weekly basis.
*Section 28-104.2.8 was amended ...
NYC General Admin. Provisions 2014 > 1 Administration > 104 Construction Documents > *§28-104.2 Application for Approval of Construction Documents > *§28-104.2.8 Notification of Rejection
Article 4 Mechanical Ventilation, Air Conditioning, and Refrigeration Systems, Posting
Information to be posted shall be as required in reference standard RS-13. Method of posting shall be as required in subchapter one of this chapter ...
NYC 1968 Code (Vol I) > 13 Mechanical Ventilation, Air Conditioning, and Refrigeration Systems > 4 Posting