• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1317.3 Post Installation

California Plumbing Code 2016 > 13 Health Care Facilities and Medical Gas and Medical Vacuum Systems > 1317.0 Station Outlets and Inlets > 1317.3 Post Installation
JUMP TO FULL CODE CHAPTER
After installation of the piping, but before installation of the station outlets and inlets and other medical gas and medical gas system components (e.g., pressure-actuating switches for alarms, manifolds, pressure gauges, or pressure relief valves), the line shall be blown clear by means of oil-free, dry nitrogen NF.

Related Code Sections


1316.3 Health Care Facilities and Medical Gas and Medical Vacuum Systems, Post Installation
After installation of the piping, but before installation of the station outlets and inlets and other medical gas and medical gas system components ...
California Plumbing Code 2019 > 13 Health Care Facilities and Medical Gas and Medical Vacuum Systems > 1316.0 Station Outlets and Inlets > 1316.3 Post Installation
1317.3 Health Care Facilities and Medical Gas and Medical Vacuum Systems, Post Installation
After installation of the piping, but before installation of the station outlets and inlets and other medical gas and medical gas system components ...
California Plumbing Code 2016 > 13 Health Care Facilities and Medical Gas and Medical Vacuum Systems > 1317.0 Station Outlets and Inlets > 1317.3 Post Installation
1901.3.3 Concrete, Post-Installed Adhesive Anchors
[OSHPD 2] Adhesive anchors qualified in accordance with ICC-ES AC 308 shall be deemed to satisfy the requirements of this section ...
California Building Code 2016 (Vol 1 & 2) > 19 Concrete > 1901 General > 1901.3 Anchoring to Concrete > 1901.3.3 Post-Installed Adhesive Anchors
1909.2.7 Concrete, Tests for Post-Installed Anchors in Concrete
When post-installed anchors are used in lieu of cast-in-place bolts, the installation verification test loads frequency and acceptance criteria shall ...
California Building Code 2016 (Vol 1 & 2) > 19 Concrete > 1909 Additional Requirements for Community Colleges [DSA-SS/CC] > 1909.2 Tests and Materials > 1909.2.7 Tests for Post-Installed Anchors in Concrete
1910A.5 Concrete, Tests for Post-Installed Anchors in Concrete
When post-installed anchors are used in lieu of cast-in place bolts, the installation verification test loads, frequency, and acceptance criteria ...
California Building Code 2016 (Vol 1 & 2) > 19A Concrete > 1910A Concrete, Reinforcement and Anchor Testing > 1910A.5 Tests for Post-Installed Anchors in Concrete
Help Contact Us Privacy Terms
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Compare
Code Compare
Highlight differences between any two building codes.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE