• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

909.2.1 Post-Fire Smoke Purge System Maintenance

NYC Fire Code 2014 > 9 Fire Protection Systems > 909 Smoke Control Systems > 909.2 Post-Fire Smoke Purge Systems > 909.2.1 Post-Fire Smoke Purge System Maintenance
JUMP TO FULL CODE CHAPTER
Post-fire smoke purge systems shall be maintained in good working order. A record of inspections and tests shall be maintained in accordance with FC107.7.

Related Code Sections


909.1 Fire Protection Systems, Scope and Purpose
are added for the purposes of Section 909 only.    POST-FIRE SMOKE PURGE SYSTEM. A mechanical or natural ventilation system intended ...
NYC Building Code 2008 > 9 Fire Protection Systems > 909 Smoke Control Systems > 909.1 Scope and Purpose
912.4 Fire Protection Systems, Maintenance
The building owner shall maintain post-fire smoke exhaust systems in good operational condition. Records of testing shall be maintained ...
NYC Building Code 2008 > 9 Fire Protection Systems > 912 Post-Fire Smoke Purge Systems > 912.4 Maintenance
916.4 Fire Protection Systems, Maintenance
The building owner shall maintain postfire smoke exhaust systems in good operational condition. Records of testing shall be maintained ...
NYC Building Code 2014 > 9 Fire Protection Systems > 916 Post-Fire Smoke Purge Systems > 916.4 Maintenance
403.4.6 Special Detailed Requirements Based on Use and Occupancy, Post-Fire Smoke Purge
A post-fire smoke purge system shall be installed in accordance with Section 916 ...
NYC Building Code 2014 > 4 Special Detailed Requirements Based on Use and Occupancy > 403 High-Rise Buildings > 403.4 Emergency Systems > 403.4.6 Post-Fire Smoke Purge
Section 515 Exhaust Systems, Post-Fire Smoke Purge Systems
Post-fire smoke purge systems shall be provided as required by Chapter 9 of the New York City Building Code ...
NYC Mechanical Code 2008 > 5 Exhaust Systems > 515 Post-Fire Smoke Purge Systems
Help Contact Us Privacy Terms
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Compare
Code Compare
Highlight differences between any two building codes.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE