• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

611.3.4 Post-Commissioning Documentation

Green Construction Code 2012 of Maryland > 6 ENERGY CONSERVATION, EFFICIENCY AND CO2e EMISSION REDUCTION > 611 Energy Systems Commissioning and Completion > 611.3 Lighting and Electrical Systems Commissioning and Completion Requirements > 611.3.4 Post-Commissioning Documentation
JUMP TO FULL CODE CHAPTER
The following documentation shall be provided to the building owner in accordance with Section 903.
  1. Settings determined during commissioning activities outlined in Section 611.3.3.
  2. A narrative describing the intent and functionality of all controls including any capability for users to override a schedule or master command.
  3. Specification sheets for all lighting equipment and controls.
  4. Operation manuals for each lighting control device. Required maintenance and maintenance schedules shall be clearly identified. Documentation and instructions necessary for building maintenance personnel to maintain and recalibrate lighting systems and controls.
  5. An annual inspection schedule for lighting controls.
  6. Troubleshooting information for fluorescent dimming systems and the remediation of switching issues such as false-ons and false-offs.

Related Code Sections


611.3.4 ENERGY CONSERVATION, EFFICIENCY AND CO2e EMISSION REDUCTION, Post-Commissioning Documentation
The following documentation shall be provided to the building owner in accordance with Section 903. Settings determined during commissioning ...
Green Construction Code 2012 of Maryland > 6 ENERGY CONSERVATION, EFFICIENCY AND CO2e EMISSION REDUCTION > 611 Energy Systems Commissioning and Completion > 611.3 Lighting and Electrical Systems Commissioning and Completion Requirements > 611.3.4 Post-Commissioning Documentation
Section 903 Commissioning, Operation and Maintenance, Commissioning
where the documented experience or training is related in complexity to the same type of commissioning activities for projects of similar complexity ...
Green Construction Code 2012 of Maryland > 9 Commissioning, Operation and Maintenance > 903 Commissioning
Section C408 [CE] Commercial Energy Efficiency, System Commissioning
in accordance with the provisions of this section. Construction document notes shall clearly indicate provisions for commissioning and completion ...
Energy Conservation Code 2015 of Maryland > 4 [CE] Commercial Energy Efficiency > C408 System Commissioning
904.2 Commissioning, Operation and Maintenance, Record Documents
The cover sheet of the record documents for the project shall clearly indicate that at least one copy of the materials shall be in the possession ...
Green Construction Code 2012 of Maryland > 9 Commissioning, Operation and Maintenance > 904 Building Operations and Maintenance > 904.2 Record Documents
C408.2.5 [CE] Commercial Energy Efficiency, Documentation Requirements
The construction documents shall specify that the documents described in this section be provided to the building owner or owner's authorized agent ...
Energy Conservation Code 2015 of Maryland > 4 [CE] Commercial Energy Efficiency > C408 System Commissioning > C408.2 Mechanical Systems and Service Water-Heating Systems Commissioning and Completion Requirements > C408.2.5 Documentation Requirements
Help Contact Us Privacy Terms
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Compare
Code Compare
Highlight differences between any two building codes.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE